Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
EFC6601R-TR
Onsemi
MOSFET 2N-CH EFCP2718

Lead Time: 9-12Days

-- --
6100
Total: $
MKP385633025JPP2T0
Vishay
CAP FILM 33UF 5% 250VDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
5100
Total: $
EFC2K102NUZTDG
Onsemi
MOSFET 2N-CH 12V 33A 10WLCSP

MPQ: 5000

Lead Time: 9-12Days

-- --
6800
Total: $
MKP385633025JPM2T0
Vishay
CAP FILM 33UF 5% 250VDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
4800
Total: $
MKP385633025JPI2T0
Vishay
CAP FILM 33UF 5% 250VDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
1500
Total: $
MKP1848C64550JP5
Vishay
CAP FILM 45UF 5% 500VDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
1800
Total: $
MKP1848C64550JP4
Vishay
CAP FILM 45UF 5% 500VDC RADIAL

MPQ: 63

Lead Time: 9-12Days

-- --
7600
Total: $
DMN2008LFU-13
Diodes Incorporated
MOSFET 2N-CH 20V 14.5A 6UDFN

MPQ: 3000

Lead Time: 9-12Days

-- --
8900
Total: $
MKP1847570444Y2
Vishay
CAP FILM 7UF 5% 440VAC RADIAL

MPQ: 40

Lead Time: 9-12Days

-- --
7300
Total: $
DMN3016LDV-13
Diodes Incorporated
MOSFET 2N-CH 21A PWRDI3333

MPQ: 3000

Lead Time: 9-12Days

-- --
6300
Total: $
F339MX263031MYM5T0
Vishay
CAP FILM 30UF 20% 450VDC RADIAL

MPQ: 45

Lead Time: 9-12Days

-- --
6900
Total: $
DMN3016LDV-7
Diodes Incorporated
MOSFET 2N-CH 21A PWRDI3333

MPQ: 2000

Lead Time: 9-12Days

-- --
900
Total: $
F339MX263031MYM4T0
Vishay
CAP FILM 30UF 20% 450VDC RADIAL

MPQ: 45

Lead Time: 9-12Days

-- --
9900
Total: $
F339MX263031MYI5T0
Vishay
CAP FILM 30UF 20% 450VDC RADIAL

MPQ: 45

Lead Time: 9-12Days

-- --
4700
Total: $
F339MX263031MYI4T0
Vishay
CAP FILM 30UF 20% 450VDC RADIAL

MPQ: 45

Lead Time: 9-12Days

-- --
6500
Total: $
DMT3022UEV-13
Diodes Incorporated
MOSFET 2N-CH 30V 17A PWRDI3333

MPQ: 3000

Lead Time: 9-12Days

-- --
1000
Total: $
F339MX263031KYM2T0
Vishay
CAP FILM 30UF 10% 450VDC RADIAL

MPQ: 40

Lead Time: 9-12Days

-- --
9500
Total: $
DMT3022UEV-7
Diodes Incorporated
MOSFET 2N-CH 30V 17A PWRDI3333

MPQ: 2000

Lead Time: 9-12Days

-- --
7900
Total: $
F339MX263031KYI2T0
Vishay
CAP FILM 30UF 10% 450VDC RADIAL

MPQ: 40

Lead Time: 9-12Days

-- --
2900
Total: $
DMC3016LDV-13
Diodes Incorporated
MOSFET N/P-CH 30V 21A PWRDI3333

MPQ: 3000

Lead Time: 9-12Days

-- --
100
Total: $
  • 1
  • 2733
  • 2734
  • 2735
  • 2736
  • 2737
  • 6670
Go to