Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
APTM50HM65FT3G
Microchip
MOSFET 4N-CH 500V 51A SP3

MPQ: 1

Lead Time: 9-12Days

-- --
1100
Total: $
HMTSW-106-23-TM-S-135-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2400
Total: $
APTM100H45STG
Microchip
MOSFET 4N-CH 1000V 18A SP4

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
HMTSW-106-23-T-S-135-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6100
Total: $
APTM50AM38STG
Microchip
MOSFET 2N-CH 500V 90A SP4

MPQ: 1

Lead Time: 9-12Days

-- --
5500
Total: $
MTSW-106-09-T-S-402-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4600
Total: $
CSD86356Q5DT
Texas Instruments
MOSFET 2N-CH 25V 40A 8VSON-CLIP

MPQ: 250

Lead Time: 9-12Days

-- --
7400
Total: $
MTSW-106-09-T-S-350-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1300
Total: $
FF45MR12W1M1B11BOMA1
Infineon
MOSFET 2N-CH 1200V AG-EASY1BM-2

MPQ: 24

Lead Time: 9-12Days

-- --
3200
Total: $
MTSW-106-09-T-S-340-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5300
Total: $
MTSW-106-09-T-S-430-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6600
Total: $
HTSW-103-16-T-D-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4800
Total: $
PMDXB550UNEZ
Nexperia
MOSFET 2N-CH 30V 0.59A 6DFN

MPQ: 5000

Lead Time: 9-12Days

-- --
8100
Total: $
HTSW-103-09-T-D-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6700
Total: $
HMTSW-107-07-T-S-010
Samtec
CONN HEADER VERT 7POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4300
Total: $
MCH6662-TL-W
Onsemi
MOSFET 2N-CH 20V 2A SC88FL

MPQ: 3000

Lead Time: 9-12Days

-- --
5600
Total: $
HTSW-106-18-T-S
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
800
Total: $
MTSW-103-09-T-D-430-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6000
Total: $
MTSW-103-09-T-D-406-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8100
Total: $
HTSW-105-07-T-S-LL
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3500
Total: $
  • 1
  • 2710
  • 2711
  • 2712
  • 2713
  • 2714
  • 6670
Go to