Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
H11N2SR2M
Onsemi
OPTOISO 4.17KV OPN COLL 6SMD

MPQ: 1000

Lead Time: 9-12Days

-- --
4800
Total: $
H11N2SR2VM
Onsemi
OPTOISO 4.17KV OPN COLL 6SMD

MPQ: 1000

Lead Time: 9-12Days

-- --
5800
Total: $
HCPL-0708-560ME
Broadcom(Avago)
OPTOISOLATOR 15MBD 8SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
3600
Total: $
TSW-102-19-T-D-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6300
Total: $
QCPL-070H-500E
Broadcom(Avago)
OPTOISOLATOR 15MBD 8SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
8600
Total: $
QCPL-073H-500E
Broadcom(Avago)
OPTOISOLATOR 15MBD 8SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
4200
Total: $
TSW-102-08-T-Q-LA
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1400
Total: $
IRF7507TRPBF
Infineon
MOSFET N/P-CH 20V 2.4A MICRO8

MPQ: 4000

Lead Time: 9-12Days

-- --
6500
Total: $
TSW-102-08-SS-D
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6000
Total: $
TSW-102-07-F-T
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2800
Total: $
IRF7316GTRPBF
Infineon
MOSFET 2P-CH 30V 4.9A 8SO

MPQ: 4000

Lead Time: 9-12Days

-- --
4800
Total: $
TSW-102-07-F-D-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4700
Total: $
FDMA1025P
Onsemi
MOSFET 2P-CH 20V 3.1A 6MICROFET

MPQ: 1

Lead Time: 9-12Days

-- --
7600
Total: $
TSW-101-08-G-Q-LA
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
600
Total: $
TMM-102-05-F-D-SM
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
1600
Total: $
TMM-102-04-F-D-SM
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
4300
Total: $
TMM-103-06-T-D
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
3500
Total: $
BSO211PNTMA1
Infineon
MOSFET 2P-CH 20V 4.7A 8DSO

MPQ: 2500

Lead Time: 9-12Days

-- --
1200
Total: $
IRF7905TRPBF
Infineon
MOSFET 2N-CH 30V 7.8A/8.9A 8SO

MPQ: 4000

Lead Time: 9-12Days

-- --
4400
Total: $
TMM-103-01-T-D-RE
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
5700
Total: $
  • 1
  • 2706
  • 2707
  • 2708
  • 2709
  • 2710
  • 6655
Go to