
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
H11N2SR2M
| Onsemi |
OPTOISO 4.17KV OPN COLL 6SMD
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
H11N2SR2VM
| Onsemi |
OPTOISO 4.17KV OPN COLL 6SMD
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
HCPL-0708-560ME
| Broadcom(Avago) |
OPTOISOLATOR 15MBD 8SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 3600 | Total:
$
| |
TSW-102-19-T-D-LL
| Samtec |
CONN HEADER VERT 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
QCPL-070H-500E
| Broadcom(Avago) |
OPTOISOLATOR 15MBD 8SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
QCPL-073H-500E
| Broadcom(Avago) |
OPTOISOLATOR 15MBD 8SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 4200 | Total:
$
| |
TSW-102-08-T-Q-LA
| Samtec |
CONN HEADER VERT 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
IRF7507TRPBF
| Infineon |
MOSFET N/P-CH 20V 2.4A MICRO8
| MPQ: 4000 Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
TSW-102-08-SS-D
| Samtec |
CONN HEADER VERT 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
TSW-102-07-F-T
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
IRF7316GTRPBF
| Infineon |
MOSFET 2P-CH 30V 4.9A 8SO
| MPQ: 4000 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
TSW-102-07-F-D-LL
| Samtec |
CONN HEADER VERT 4POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
FDMA1025P
| Onsemi |
MOSFET 2P-CH 20V 3.1A 6MICROFET
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
TSW-101-08-G-Q-LA
| Samtec |
CONN HEADER VERT 2POS
| MPQ: 1 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
TMM-102-05-F-D-SM
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
TMM-102-04-F-D-SM
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
TMM-103-06-T-D
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
BSO211PNTMA1
| Infineon |
MOSFET 2P-CH 20V 4.7A 8DSO
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
IRF7905TRPBF
| Infineon |
MOSFET 2N-CH 30V 7.8A/8.9A 8SO
| MPQ: 4000 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
TMM-103-01-T-D-RE
| Samtec |
2MM TERMINAL STRIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5700 | Total:
$
|