
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
B32361B3506J030
| Tdk |
CAP FILM 50UF 5% 330VAC RADIAL
| MPQ: 12 Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
HCPL-6251
| Broadcom(Avago) |
OPTOISO 1.5KV PUSH PULL 16FLATPK
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7300 | Total:
$
| |
67997-516H
| Amphenol |
CONN HEADER VERT 16POS 2.54MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
B32361A4306J080
| Tdk |
CAP FILM 30UF 5% 480VAC RADIAL
| MPQ: 12 Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
HCPL-560K-100
| Broadcom(Avago) |
OPTOISO 1.5KV OPEN COLL 8SMD
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
F339MX263531KYM5T0
| Vishay |
CAP FILM 35UF 10% 450VDC RADIAL
| MPQ: 40 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
HCPL-560K-300
| Broadcom(Avago) |
OPTOISO 1.5KV OPEN COLL 8DIP GW
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1700 | Total:
$
| |
SM10B-SRSS-G-TB(LF)(SN)
| J.S.T.Mfg.Co.,Ltd. |
CONN HEADER SMD R/A 10POS 1MM
| MPQ: 3000 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
HCPL-560K#200
| Broadcom(Avago) |
OPTOISO 1.5KV OPN COLLECTOR 8DIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
10131319-0621200LF
| Amphenol |
CONN HEADER VERT
| MPQ: 420 Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
5962-9085501KPA
| Broadcom(Avago) |
OPTOISO 1.5KV OPN COLLECTOR 8DIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
F339MX263531KYM4T0
| Vishay |
CAP FILM 35UF 10% 450VDC RADIAL
| MPQ: 40 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
5962-9085501KPC
| Broadcom(Avago) |
OPTOISO 1.5KV OPN COLLECTOR 8DIP
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
F339MX263531KYI5T0
| Vishay |
CAP FILM 35UF 10% 450VDC RADIAL
| MPQ: 40 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
5962-9085501KXA
| Broadcom(Avago) |
OPTOISO 1.5KV OPEN COLL 8DIP GW
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
0022286105
| Molex |
CONN HEADER R/A 10POS 2.54MM
| MPQ: 375 Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
5962-9085501KYA
| Broadcom(Avago) |
OPTOISO 1.5KV OPEN COLL 8SMD
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
F339MX263531KYI4T0
| Vishay |
CAP FILM 35UF 10% 450VDC RADIAL
| MPQ: 40 Lead Time: 9-12Days | -- -- | 400 | Total:
$
| |
5962-9085501KYC
| Broadcom(Avago) |
OPTOISO 1.5KV OPEN COLL 8SMD
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
178841-1
| Te Connectivity |
CONN HEADER VERT 3POS 6.2MM
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 5500 | Total:
$
|