Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PS9821-2-V-AX
Renesas
OPTOISO 2.5KV 2CH OPEN COL 8SSOP

MPQ: 20

Lead Time: 9-12Days

-- --
4100
Total: $
VJ1206A270GXCAC
Vishay
CAP CER 27PF 200V C0G/NP0 1206

MPQ: 3000

Lead Time: 9-12Days

-- --
8500
Total: $
HCPL-7721-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
8300
Total: $
MKP1848C68060JY2
Vishay
CAP FILM 80UF 5% 600VDC RADIAL

MPQ: 40

Lead Time: 9-12Days

-- --
8700
Total: $
HCPL-7721-520E
Broadcom(Avago)
OPTOISO 5KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
8500
Total: $
HCPL-4661-500E
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
2000
Total: $
HCPL-263N-500E
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
3700
Total: $
SFS37T40K291B-F
Cornell Dubilier
CAP FILM 40UF 10% 370VAC RADIAL

MPQ: 42

Lead Time: 9-12Days

-- --
8900
Total: $
HCPL-7723-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
5800
Total: $
VJ1206A220GXCMP
Vishay
CAP CER 22PF 200V C0G/NP0 1206

MPQ: 10000

Lead Time: 9-12Days

-- --
0
Total: $
HCPL-7723-520E
Broadcom(Avago)
OPTOISO 5KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
7700
Total: $
MKP385610085JYP2T0
Vishay
CAP FILM 10UF 5% 850VDC RADIAL

MPQ: 40

Lead Time: 9-12Days

-- --
1300
Total: $
HCPL-7721-020E
Broadcom(Avago)
OPTOISO 5KV PUSH PULL 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
300
Total: $
VJ1206A220GXCMC
Vishay
CAP CER 22PF 200V C0G/NP0 1206

MPQ: 3000

Lead Time: 9-12Days

-- --
500
Total: $
HCPL-7721-300E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 50

Lead Time: 9-12Days

-- --
7300
Total: $
MKP385610085JYM2T0
Vishay
CAP FILM 10UF 5% 850VDC RADIAL

MPQ: 40

Lead Time: 9-12Days

-- --
6900
Total: $
HCPL-7721-060E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
3900
Total: $
VJ1206A220GXCAP
Vishay
CAP CER 22PF 200V C0G/NP0 1206

MPQ: 10000

Lead Time: 9-12Days

-- --
4300
Total: $
MKP385610085JYI2T0
Vishay
CAP FILM 10UF 5% 850VDC RADIAL

MPQ: 40

Lead Time: 9-12Days

-- --
6400
Total: $
PS9303L2-V-AX
Renesas
OPTOISO 5KV PUSH PULL 6DIP GW

MPQ: 20

Lead Time: 9-12Days

-- --
8600
Total: $
  • 1
  • 2647
  • 2648
  • 2649
  • 2650
  • 2651
  • 6670
Go to