Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ERM1KM220E12OT
Aishi
2.5mm 100V ±20% 22uF ,D6.3xL12mm

Lead Time: 9-12Days

-- --
8900
Total: $
AC0805FR-07180RL
Yageo
RES SMD 180 OHM 1% 1/8W 0805

Lead Time: 9-12Days

-- --
5300
Total: $
SPZ1HM470E08O00RAXXX
Aishi
50V ±20% 2.1A@100kHz 47uF ,D6.3xL8mm

Lead Time: 9-12Days

-- --
9300
Total: $
SPZ1HM471G18O00RAXXX
Aishi
50V ±20% 470uF ,D10xL18mm

Lead Time: 9-12Days

-- --
2700
Total: $
UUX2A4R7MCL1GS
Nichicon
4.7µF-100V---Can-SMD-105°C--2000-

Lead Time: 9-12Days

-- --
4300
Total: $
ERS1EM102G16OT
Aishi
25V ±20% 1000uF 10mm ,D10xL16mm

Lead Time: 9-12Days

-- --
1500
Total: $
ERK2GM220G16OT
Aishi
5mm 400V ±20% 22uF ,D10xL16mm

Lead Time: 9-12Days

-- --
1700
Total: $
ERS1KM470F12OT
Aishi
3.5mm 100V ±20% 47uF ,D8xL12mm

Lead Time: 9-12Days

-- --
3300
Total: $
ERS1HM102W25OT
Aishi
50V ±20% 1000uF ,D12.5xL25mm

Lead Time: 9-12Days

-- --
3500
Total: $
ERH2GM820L25OT
Aishi
7.5mm 400V ±20% 82uF ,D16xL25mm

Lead Time: 9-12Days

-- --
4700
Total: $
ERR1AM471E11OT
Aishi
2.5mm 10V ±20% 470uF ,D6.3xL11mm

Lead Time: 9-12Days

-- --
8500
Total: $
ERR1VM101E11OT
Aishi
2.5mm 35V ±20% 100uF ,D6.3xL11mm

Lead Time: 9-12Days

-- --
9300
Total: $
EGD2WM100G16OT
Aishi
450V ±20% 218mA@100kHz 10uF ,D10xL16mm

Lead Time: 9-12Days

-- --
2500
Total: $
ERJ1VM151E12OT
Aishi
RJ35V150uF 150uF 35V 6.3*12

Lead Time: 9-12Days

-- --
7700
Total: $
ERF1JM101F12OT
Aishi
3.5mm 63V ±20% 100uF ,D8xL12mm

Lead Time: 9-12Days

-- --
8100
Total: $
ERM1JM100D11OT
Aishi
63V ±20% 80mA@100kHz 10uF ,D5xL11mm

Lead Time: 9-12Days

-- --
9500
Total: $
ERJ1GN0R00C
Panasonic
50mW 0Ω -55℃~+125℃ 0201

Lead Time: 9-12Days

-- --
5300
Total: $
ERS1EM221E11OT
Aishi
2.5mm 25V ±20% 220uF ,D6.3xL11mm

Lead Time: 9-12Days

-- --
4900
Total: $
GM3085N
Gatemode
RS-485/RS-422 GM3085N SOP-8

Lead Time: 9-12Days

-- --
5700
Total: $
GX2431D
Gxcas
EEPROM GX2431D DFN6_4X4MM_EP

Lead Time: 9-12Days

-- --
5700
Total: $
  • 1
  • 262
  • 263
  • 264
  • 265
  • 266
  • 6854
Go to