Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
1206AA330JAT1A
Kyocera Avx Components
CAP CER 33PF 1KV NP0 1206

MPQ: 2000

Lead Time: 9-12Days

-- --
8800
Total: $
C1210C123K5JACAUTO
Kemet(Yageo)
CAP CER 0.012UF 50V U2J 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
4200
Total: $
HCPL-2630-520E
Broadcom(Avago)
OPTOISO 5KV 2CH OPEN COL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
7300
Total: $
C1210C183K5JACAUTO
Kemet(Yageo)
CAP CER 0.018UF 50V U2J 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
5800
Total: $
C1210C273K5JACAUTO
Kemet(Yageo)
CAP CER 0.027UF 50V U2J 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
800
Total: $
PS9851-1-AX
Renesas
OPTOISO 2.5KV PUSH PULL 8SSOP

MPQ: 20

Lead Time: 9-12Days

-- --
4000
Total: $
1206Y0160561KXT
Knowles
CAP CER 560PF 16V X7R 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8000
Total: $
HCPL-M456#500
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 5SO

MPQ: 1500

Lead Time: 9-12Days

-- --
7400
Total: $
FOD0720R2
Onsemi
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 2500

Lead Time: 9-12Days

-- --
5100
Total: $
1206Y0160471KXT
Knowles
CAP CER 470PF 16V X7R 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
6400
Total: $
PS9303L2-E3-AX
Renesas
OPTOISO 5KV PUSH PULL 6DIP GW

MPQ: 2000

Lead Time: 9-12Days

-- --
100
Total: $
HCNW2201-500E
Broadcom(Avago)
OPTOISO 5KV PUSH PULL 8DIP GW

MPQ: 750

Lead Time: 9-12Days

-- --
1400
Total: $
1206Y0160331KXT
Knowles
CAP CER 330PF 16V X7R 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
2300
Total: $
HCPL-261N#500
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
5300
Total: $
ACPL-M46U-500E
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 5SO

MPQ: 1500

Lead Time: 9-12Days

-- --
8300
Total: $
RDEC71H105K1S1H03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
6000
Total: $
ACPL-024L-560E
Broadcom(Avago)
OPTOISO 3.75KV 2CH PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
8300
Total: $
CC1206GRNPO0BN272
Yageo
CAP CER 2700PF 100V C0G/NPO 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
3400
Total: $
HCPL-261N-520
Broadcom(Avago)
OPTOCOUPLER 10MBD UL+T/R

MPQ: 1000

Lead Time: 9-12Days

-- --
3700
Total: $
C1210C124M3JACAUTO
Kemet(Yageo)
CAP CER 0.12UF 25V U2J 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
2500
Total: $
  • 1
  • 2623
  • 2624
  • 2625
  • 2626
  • 2627
  • 6655
Go to