Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C1206S153KARAC7800
Kemet(Yageo)
CAP CER 0.015UF 250V X7R 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
3700
Total: $
FOD8012R2
Onsemi
OPTOISO 3.75KV 2CH PUSH PULL 8SO

Lead Time: 9-12Days

-- --
7300
Total: $
12068A820JAT2D
Kyocera Avx Components
CAP CER 82PF 400V NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
7500
Total: $
HCPL-4506#300
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 50

Lead Time: 9-12Days

-- --
2200
Total: $
12067A8R0CAT1A
Kyocera Avx Components
CAP CER 8PF 500V NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
7000
Total: $
HCPL-4506#500
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
1200
Total: $
0805ZC684M4T2A
Kyocera Avx Components
CAP CER 0.68UF 10V X7R 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
8700
Total: $
HCPL-4506#060
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
7300
Total: $
LLA215C70G475ME19L
Murata
CAP CER 4.7UF 4V X7S 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
1200
Total: $
HCPL-4506#020
Broadcom(Avago)
OPTOISO 5KV OPEN COLLECTOR 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
5900
Total: $
C1808C473M5RACTU
Kemet(Yageo)
CAP CER 0.047UF 50V X7R 1808

MPQ: 2500

Lead Time: 9-12Days

-- --
2000
Total: $
ACPL-W484-500E
Broadcom(Avago)
OPTOISO 5KV PUSH PULL 6SO

MPQ: 1000

Lead Time: 9-12Days

-- --
6600
Total: $
ACPL-P483-060E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 6SO

MPQ: 100

Lead Time: 9-12Days

-- --
8500
Total: $
C1808C333K5RACTU
Kemet(Yageo)
CAP CER 0.033UF 50V X7R 1808

MPQ: 2500

Lead Time: 9-12Days

-- --
4800
Total: $
ACPL-P484-060E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 6SO

MPQ: 100

Lead Time: 9-12Days

-- --
600
Total: $
C1808C103K5RACTU
Kemet(Yageo)
CAP CER 10000PF 50V X7R 1808

MPQ: 2500

Lead Time: 9-12Days

-- --
6700
Total: $
ACPL-P484-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 6SO

MPQ: 1000

Lead Time: 9-12Days

-- --
4400
Total: $
C1210C124J5RACTU
Kemet(Yageo)
CAP CER 0.12UF 50V X7R 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
6000
Total: $
ACPL-W484-060E
Broadcom(Avago)
OPTOISO 5KV PUSH PULL 6SO

MPQ: 100

Lead Time: 9-12Days

-- --
8700
Total: $
C1206C275K4PACTU
Kemet(Yageo)
CAP CER 2.7UF 16V X5R 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8600
Total: $
  • 1
  • 2620
  • 2621
  • 2622
  • 2623
  • 2624
  • 6670
Go to