Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HCPL-060L-560
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
8200
Total: $
1206PC333MAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
4600
Total: $
0805AC101MAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
3400
Total: $
12067C272MAT2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
7500
Total: $
HCPL-0211-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
6600
Total: $
12067A5R6CAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
9700
Total: $
HCNW4506-000E
Broadcom(Avago)
OPTOISO 5KV OPEN COLLECTOR 8DIP

MPQ: 42

Lead Time: 9-12Days

-- --
300
Total: $
HCPL-061N-000E
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 100

Lead Time: 9-12Days

-- --
9000
Total: $
1206AA330MAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
4300
Total: $
HCPL-2202-060E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
600
Total: $
LD035A560GAB2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
2500
Total: $
HCPL-2201-060E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
3500
Total: $
LD035A121GAB2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
4700
Total: $
HCPL-2202-300E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 50

Lead Time: 9-12Days

-- --
2900
Total: $
LD031A101GAB2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
400
Total: $
HCPL-260L
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
4400
Total: $
LD035A331GAB2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
9100
Total: $
HCPL-2201-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
9100
Total: $
LD035A220GAB2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
9100
Total: $
12067A910JAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
8800
Total: $
  • 1
  • 2615
  • 2616
  • 2617
  • 2618
  • 2619
  • 6670
Go to