Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HCPL-060L#500
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
2800
Total: $
LD035A101GAB2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
9900
Total: $
HCPL-060L#060
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 100

Lead Time: 9-12Days

-- --
7000
Total: $
LD031A161GAB2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
3000
Total: $
HCPL-061A-560E
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
1900
Total: $
08057C101KAT2A
Kyocera Avx Components
CAP CER 100PF 500V X7R 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
2000
Total: $
12067A8R0CAT2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
6200
Total: $
HCPL-0211-060E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 100

Lead Time: 9-12Days

-- --
3200
Total: $
FOD2200V
Onsemi
OPTOISO 5KV TRI-STATE 8DIP

MPQ: 1000

Lead Time: 9-12Days

-- --
7700
Total: $
1206AA330JAT2A
Kyocera Avx Components
CAP CER 33PF 1KV C0G/NP0 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
8300
Total: $
HCPL-2202-000E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
6500
Total: $
12067A270JAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
600
Total: $
HCPL-060L-560
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
8200
Total: $
1206PC333MAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
4600
Total: $
0805AC101MAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
3400
Total: $
12067C272MAT2A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
7500
Total: $
HCPL-0211-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
6600
Total: $
12067A5R6CAT1A
Kyocera Avx Components
CAP CER SMD

MPQ: 4000

Lead Time: 9-12Days

-- --
9700
Total: $
HCNW4506-000E
Broadcom(Avago)
OPTOISO 5KV OPEN COLLECTOR 8DIP

MPQ: 42

Lead Time: 9-12Days

-- --
300
Total: $
HCPL-061N-000E
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 100

Lead Time: 9-12Days

-- --
9000
Total: $
  • 1
  • 2614
  • 2615
  • 2616
  • 2617
  • 2618
  • 6655
Go to