Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ACPL-P481-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 6SO

MPQ: 1000

Lead Time: 9-12Days

-- --
6800
Total: $
ACPL-077L-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
9100
Total: $
RDER72H333K2M1H03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
6600
Total: $
ACPL-M75L-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 5SO

MPQ: 1500

Lead Time: 9-12Days

-- --
6000
Total: $
RDER72H153K2M1H03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
400
Total: $
ACPL-M484-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 5SO

MPQ: 1500

Lead Time: 9-12Days

-- --
1700
Total: $
ACPL-M483-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 5SO

MPQ: 1500

Lead Time: 9-12Days

-- --
8200
Total: $
RDER72H683K3M1H03A
Murata
CAP CER

MPQ: 2000

Lead Time: 9-12Days

-- --
4300
Total: $
PS9587L3-E3-AX
Renesas
OPTOISO 5KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
3000
Total: $
GCM2195C1J123JA16D
Murata
CAP CER 0.012UF 63V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
8700
Total: $
HCPL-060L
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 100

Lead Time: 9-12Days

-- --
6900
Total: $
GCM2195C1J113JA16D
Murata
CAP CER 0.011UF 63V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
8500
Total: $
HCPL-261N-520E
Broadcom(Avago)
OPTOISO 5KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
3500
Total: $
ACPL-4800-560E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
2300
Total: $
GCM2195C1J133JA16D
Murata
CAP CER 0.013UF 63V C0G/NP0 0805

MPQ: 4000

Lead Time: 9-12Days

-- --
6500
Total: $
C1206X333F4HAC7800
Kemet(Yageo)
CAP CER 1206 33NF 16V ULTRA STAB

MPQ: 4000

Lead Time: 9-12Days

-- --
2200
Total: $
HCPL-0466-560E
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
5000
Total: $
C1206X273F4HAC7800
Kemet(Yageo)
CAP CER 1206 27NF 16V ULTRA STAB

MPQ: 4000

Lead Time: 9-12Days

-- --
500
Total: $
ACPL-4800-360E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 50

Lead Time: 9-12Days

-- --
1500
Total: $
C1206X223F4HAC7800
Kemet(Yageo)
CAP CER 1206 22NF 16V ULTRA STAB

MPQ: 4000

Lead Time: 9-12Days

-- --
7200
Total: $
  • 1
  • 2612
  • 2613
  • 2614
  • 2615
  • 2616
  • 6655
Go to