Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
B32373A4307J020
Tdk
CAP FILM 300UF 5% 1.05KVDC RAD

MPQ: 20

Lead Time: 9-12Days

-- --
9700
Total: $
OTBH156KNPIR-F
Cornell Dubilier
CAP FILM 15UF 10% 1.5KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
5100
Total: $
FOD060LR2
Onsemi
OPTOISO 3.75KV OPN COLLECTOR 8SO

Lead Time: 9-12Days

-- --
400
Total: $
SCRN216R-F
Cornell Dubilier
CAP FILM 20UF 10% 400VPK RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
400
Total: $
947D331K122AHGSN
Cornell Dubilier
CAP FILM 330UF 10% 1.2KVDC RAD

MPQ: 12

Lead Time: 9-12Days

-- --
1400
Total: $
947D311K132BHMSN
Cornell Dubilier
CAP FILM 310UF 10% 1.3KVDC RAD

MPQ: 12

Lead Time: 9-12Days

-- --
3900
Total: $
HCPL-261N-500E
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
1300
Total: $
947D271K122CDRSN
Cornell Dubilier
CAP FILM 270UF 10% 1.2KVDC RAD

MPQ: 12

Lead Time: 9-12Days

-- --
5000
Total: $
B25620B1457K103
Tdk
CAP FILM 450UF 10% 1.1KVDC RAD

MPQ: 64

Lead Time: 9-12Days

-- --
8500
Total: $
B25620B1147K981
Tdk
CAP FILM 145UF 10% 1.98KVDC RAD

MPQ: 64

Lead Time: 9-12Days

-- --
1300
Total: $
947D271K112CCRSN
Cornell Dubilier
CAP FILM 270UF 10% 1.1KVDC RAD

MPQ: 12

Lead Time: 9-12Days

-- --
7300
Total: $
HCPL0637R2
Onsemi
OPTOISO 3.75KV 2CH OPEN COLL 8SO

Lead Time: 9-12Days

-- --
7600
Total: $
HCPL-260L-500E
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
1400
Total: $
947D351K901BCMSN
Cornell Dubilier
CAP FILM 350UF 10% 900VDC RADIAL

MPQ: 12

Lead Time: 9-12Days

-- --
5800
Total: $
HCPL2631SDV
Onsemi
OPTOISO 2.5KV 2CH OPEN COLL 8DIP

MPQ: 1000

Lead Time: 9-12Days

-- --
8100
Total: $
947D321K112AFGSN
Cornell Dubilier
CAP FILM 320UF 10% 1.1KVDC RAD

MPQ: 12

Lead Time: 9-12Days

-- --
1500
Total: $
ACPL-W70L-500E
Broadcom(Avago)
OPTOISO 5KV PUSH PULL 6SSO

MPQ: 1000

Lead Time: 9-12Days

-- --
5900
Total: $
947D251K132DCRSN
Cornell Dubilier
CAP FILM 250UF 10% 1.3KVDC RAD

MPQ: 12

Lead Time: 9-12Days

-- --
9700
Total: $
HCPL-2212-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
7400
Total: $
B25620B1317K323
Tdk
CAP FILM 310UF 10% 1.32KVDC RAD

MPQ: 64

Lead Time: 9-12Days

-- --
2300
Total: $
  • 1
  • 2581
  • 2582
  • 2583
  • 2584
  • 2585
  • 6670
Go to