Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ACPL-K64L-560E
Broadcom(Avago)
OPTOISO 5KV 2CH PUSH PULL 8SO

MPQ: 1000

Lead Time: 9-12Days

-- --
1600
Total: $
C0603C821G5GACAUTO
Kemet(Yageo)
CAP CER 820PF 50V C0G/NP0 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
0
Total: $
ACSL-7210-50RE
Broadcom(Avago)
OPTOISO 3.75KV 2CH PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
5300
Total: $
ACNV2601-500E
Broadcom(Avago)
OPTOISO 7.5KV OPEN COLL 10DIP GW

Lead Time: 9-12Days

-- --
9800
Total: $
C1210C393K5JACAUTO
Kemet(Yageo)
CAP CER 0.039UF 50V U2J 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
8900
Total: $
C1210C563K5JACAUTO
Kemet(Yageo)
CAP CER 0.056UF 50V U2J 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
4200
Total: $
ACPL-M21L-000E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 5SO

MPQ: 100

Lead Time: 9-12Days

-- --
7300
Total: $
C1210X103K1RACAUTO
Kemet(Yageo)
CAP CER 10000PF 100V X7R 1210

MPQ: 4000

Lead Time: 9-12Days

-- --
2600
Total: $
HCPL-0611-000E
Broadcom(Avago)
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 100

Lead Time: 9-12Days

-- --
600
Total: $
ACPL-M61L-000E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 5SO

MPQ: 100

Lead Time: 9-12Days

-- --
2900
Total: $
SR151A151FARTR1
Kyocera Avx Components
CAP CER RADIAL

MPQ: 3500

Lead Time: 9-12Days

-- --
3600
Total: $
HCPL-2231-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
3900
Total: $
SL151A221FAB
Kyocera Avx Components
CAP CER RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
8300
Total: $
ACPL-071L-000E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 100

Lead Time: 9-12Days

-- --
5200
Total: $
SR151A271FAR
Kyocera Avx Components
CAP CER RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
0
Total: $
0603J0160152JDT
Knowles
CAP CER 1500PF 16V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
800
Total: $
0603J0160104MDT
Knowles
CAP CER 0.1UF 16V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
9500
Total: $
HCPL-0211-000E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 100

Lead Time: 9-12Days

-- --
4800
Total: $
SR151A151FAR
Kyocera Avx Components
CAP CER 150PF 100V NP0 RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
6700
Total: $
HCPL-0661-500E
Broadcom(Avago)
OPTOISO 3.75KV 2CH OPEN COLL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
9500
Total: $
  • 1
  • 2567
  • 2568
  • 2569
  • 2570
  • 2571
  • 6670
Go to