Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C1206X153KMGECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 63V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
8000
Total: $
C1206X222KMGECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 63V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
5400
Total: $
C1206X683K5GECAUTO
Kemet(Yageo)
CAP CER 1206 68NF 50V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
9200
Total: $
ACPL-072L-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
400
Total: $
C1206X333K5GECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 50V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
3700
Total: $
C1206X223K5GECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 50V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
2300
Total: $
C1206X153K5GECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 50V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
4600
Total: $
HCNW2211-500E
Broadcom(Avago)
OPTOISO 5KV PUSH PULL 8DIP GW

MPQ: 750

Lead Time: 9-12Days

-- --
6000
Total: $
HCPL2601S
Onsemi
OPTOISO 2.5KV OPN COLLECTOR 8SMD

MPQ: 50

Lead Time: 9-12Days

-- --
2800
Total: $
C1206X683K3GECAUTO
Kemet(Yageo)
CAP CER 1206 68NF 25V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
8000
Total: $
C1206X473K3GECAUTO
Kemet(Yageo)
CAP CER 1206 47NF 25V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
3800
Total: $
C1206X333K3GECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 25V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
8800
Total: $
C1206X223K3GECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 25V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
9200
Total: $
C1206X153K3GECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 25V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
3000
Total: $
C1206X222K3GECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 25V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
6600
Total: $
LD03ZC104KAB2A500
Kyocera Avx Components
CAP CER SMD

MPQ: 500

Lead Time: 9-12Days

-- --
9700
Total: $
C317C110J5G5TA
Kemet(Yageo)
CAP CER 11PF 50V NP0 RADIAL

MPQ: 500

Lead Time: 9-12Days

-- --
9900
Total: $
ACPL-M61T-500E
Broadcom(Avago)
OPTOISO 4KV OPN COLLECTOR 5SO

MPQ: 1500

Lead Time: 9-12Days

-- --
1300
Total: $
C1206C333J5JAC7800
Kemet(Yageo)
CAP CER 0.033UF 50V U2J 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
5600
Total: $
HCPL-7710-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
3100
Total: $
  • 1
  • 2566
  • 2567
  • 2568
  • 2569
  • 2570
  • 6670
Go to