Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ACPL-071L-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
9000
Total: $
C1206X222K2GECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 200V C0G

MPQ: 2500

Lead Time: 9-12Days

-- --
5200
Total: $
C1206X333K1GECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 100V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
9300
Total: $
C1206X223K1GECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 100V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
5000
Total: $
HCPL-0211-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
8400
Total: $
C1206X153K1GECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 100V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
3100
Total: $
HCNW4506-500E
Broadcom(Avago)
OPTOISO 5KV OPEN COLL 8DIP GW

MPQ: 750

Lead Time: 9-12Days

-- --
9500
Total: $
C1206X222K1GECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 100V C0G

MPQ: 2500

Lead Time: 9-12Days

-- --
9700
Total: $
HCPL-2211-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
9200
Total: $
C1206X473KMGECAUTO
Kemet(Yageo)
CAP CER 1206 47NF 63V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
8800
Total: $
HCPL-2630-500E
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
8400
Total: $
C1206X333KMGECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 63V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
8000
Total: $
C1206X223KMGECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 63V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
1200
Total: $
HCPL-2631-500E
Broadcom(Avago)
OPTOISO 3.75KV OPEN COLL 8DIP GW

MPQ: 1000

Lead Time: 9-12Days

-- --
9900
Total: $
C1206X153KMGECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 63V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
8000
Total: $
C1206X222KMGECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 63V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
5400
Total: $
C1206X683K5GECAUTO
Kemet(Yageo)
CAP CER 1206 68NF 50V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
9200
Total: $
ACPL-072L-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
400
Total: $
C1206X333K5GECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 50V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
3700
Total: $
C1206X223K5GECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 50V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
2300
Total: $
  • 1
  • 2563
  • 2564
  • 2565
  • 2566
  • 2567
  • 6655
Go to