Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C1206X223M5GECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 50V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
1000
Total: $
HCPL-2200-000E
Broadcom(Avago)
OPTOISO 3.75KV TRI-STATE 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
1900
Total: $
C1206X153M5GECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 50V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
8400
Total: $
HCPL-5230
Broadcom(Avago)
OPTOISO 1.5KV 2CH PUSH PULL 8DIP

MPQ: 25

Lead Time: 9-12Days

-- --
3200
Total: $
C1206X222M5GECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 50V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
6500
Total: $
C1206X104M3GECAUTO
Kemet(Yageo)
CAP CER 1206 0.1UF 25V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
7500
Total: $
C1206X683M3GECAUTO
Kemet(Yageo)
CAP CER 1206 68NF 25V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
7400
Total: $
C1206X473M3GECAUTO
Kemet(Yageo)
CAP CER 1206 47NF 25V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
7800
Total: $
C1206X333M3GECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 25V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
0
Total: $
C1206X223M3GECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 25V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
8000
Total: $
C1206X153M3GECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 25V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
8900
Total: $
HCPL2630SD
Onsemi
OPTOISO 2.5KV 2CH OPEN COLL 8SMD

MPQ: 1000

Lead Time: 9-12Days

-- --
7800
Total: $
C1206X222M3GECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 25V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
6000
Total: $
HCPL2631SD
Onsemi
OPTOISO 2.5KV 2CH OPEN COLL 8DIP

MPQ: 1000

Lead Time: 9-12Days

-- --
5400
Total: $
HCPL0611R2
Onsemi
OPTOISO 3.75KV OPN COLLECTOR 8SO

MPQ: 2500

Lead Time: 9-12Days

-- --
5800
Total: $
C1206X223KAGECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 250V C0G 10%

MPQ: 2000

Lead Time: 9-12Days

-- --
3600
Total: $
ACPL-M21L-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 5SO

MPQ: 1500

Lead Time: 9-12Days

-- --
6200
Total: $
C1206X153KAGECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 250V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
8800
Total: $
C1206X222KAGECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 250V C0G

MPQ: 2500

Lead Time: 9-12Days

-- --
2000
Total: $
C1206X153K2GECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 200V C0G 10%

MPQ: 2500

Lead Time: 9-12Days

-- --
9100
Total: $
  • 1
  • 2562
  • 2563
  • 2564
  • 2565
  • 2566
  • 6655
Go to