Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C1206X223M2GECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 200V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
2500
Total: $
US6J2TR
Rohm Semiconductor
MOSFET 2P-CH 20V 1A TUMT6

MPQ: 3000

Lead Time: 9-12Days

-- --
9500
Total: $
C1206X153M2GECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 200V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
1300
Total: $
C1206X222M2GECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 200V C0G

MPQ: 2500

Lead Time: 9-12Days

-- --
3300
Total: $
C1206X473M1GECAUTO
Kemet(Yageo)
CAP CER 1206 47NF 100V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
5900
Total: $
C1206X333M1GECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 100V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
200
Total: $
C1206X223M1GECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 100V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
400
Total: $
C1206X153M1GECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 100V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
2800
Total: $
C1206X222M1GECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 100V C0G

MPQ: 2500

Lead Time: 9-12Days

-- --
5700
Total: $
C1206X473MMGECAUTO
Kemet(Yageo)
CAP CER 1206 47NF 63V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
7800
Total: $
C1206X333MMGECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 63V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
5800
Total: $
FDZ1416NZ
Onsemi
MOSFET 2N-CH 4WLCSP

MPQ: 5000

Lead Time: 9-12Days

-- --
8800
Total: $
C1206X223MMGECAUTO
Kemet(Yageo)
CAP CER 1206 22NF 63V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
3600
Total: $
C1206X153MMGECAUTO
Kemet(Yageo)
CAP CER 1206 15NF 63V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
2300
Total: $
C1206X222MMGECAUTO
Kemet(Yageo)
CAP CER 1206 2.2NF 63V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
5600
Total: $
C1206X683M5GECAUTO
Kemet(Yageo)
CAP CER 1206 68NF 50V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
9900
Total: $
C1206X473M5GECAUTO
Kemet(Yageo)
CAP CER 1206 47NF 50V C0G 20%

MPQ: 2000

Lead Time: 9-12Days

-- --
3700
Total: $
C1206X333M5GECAUTO
Kemet(Yageo)
CAP CER 1206 33NF 50V C0G 20%

MPQ: 2500

Lead Time: 9-12Days

-- --
300
Total: $
HCPL-0720-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
0
Total: $
HCPL-0721-500E
Broadcom(Avago)
OPTOISO 3.75KV PUSH PULL 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
900
Total: $
  • 1
  • 2561
  • 2562
  • 2563
  • 2564
  • 2565
  • 6655
Go to