Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
1206Y0501P20DCT
Knowles
CAP CER 1.2PF 50V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
800
Total: $
1206Y0501P00DCT
Knowles
CAP CER 1PF 50V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8000
Total: $
1206Y0258P20DCT
Knowles
CAP CER 8.2PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
7100
Total: $
FDC6304P
Onsemi
MOSFET 2P-CH 25V 0.46A SSOT6

MPQ: 3000

Lead Time: 9-12Days

-- --
9200
Total: $
ECH8693R-TL-W
Onsemi
MOSFET 2N-CH 24V 14A SOT28

MPQ: 3000

Lead Time: 9-12Days

-- --
9400
Total: $
1206Y0256P80DCT
Knowles
CAP CER 6.8PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
5400
Total: $
1206Y0255P60DCT
Knowles
CAP CER 5.6PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
5300
Total: $
1206Y0254P70DCT
Knowles
CAP CER 4.7PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
5600
Total: $
1206Y0253P90DCT
Knowles
CAP CER 3.9PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4000
Total: $
1206Y0253P30DCT
Knowles
CAP CER 3.3PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
5700
Total: $
1206Y0252P70DCT
Knowles
CAP CER 2.7PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4700
Total: $
1206Y0252P20DCT
Knowles
CAP CER 2.2PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
800
Total: $
1206Y0251P80DCT
Knowles
CAP CER 1.8PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
7200
Total: $
1206Y0251P50DCT
Knowles
CAP CER 1.5PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8800
Total: $
NTLUD4C26NTAG
Onsemi
MOSFET 2N-CH 30V 9.1A 6UDFN

MPQ: 3000

Lead Time: 9-12Days

-- --
9300
Total: $
1206Y0251P20DCT
Knowles
CAP CER 1.2PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
600
Total: $
1206Y0251P00DCT
Knowles
CAP CER 1PF 25V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
2300
Total: $
1206Y0168P20DCT
Knowles
CAP CER 8.2PF 16V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8700
Total: $
1206Y0166P80DCT
Knowles
CAP CER 6.8PF 16V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
9000
Total: $
FDS8984
Onsemi
MOSFET 2N-CH 30V 7A 8SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
4600
Total: $
  • 1
  • 2554
  • 2555
  • 2556
  • 2557
  • 2558
  • 6655
Go to