Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PS9402-V-AX
Renesas
OPTOISO 5KV 1CH GATE DVR 16SSOP

MPQ: 10

Lead Time: 9-12Days

-- --
1300
Total: $
PS9905-Y-V-AX
Renesas
OPTOISO 7.5KV 1CH GT DVR 8LSDIP

MPQ: 10

Lead Time: 9-12Days

-- --
7400
Total: $
C333C622JAG5TA
Kemet(Yageo)
CAP CER RAD 6.2NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
4500
Total: $
FOD8334
Onsemi
OPTOISO 4.243KV 1CH GT DVR 16SO

MPQ: 1000

Lead Time: 9-12Days

-- --
3700
Total: $
XL25-20-20-2
T-Global Technology
XL25 CERAMIC BOARD 20X20X2MM

MPQ: 1

Lead Time: 9-12Days

-- --
8000
Total: $
FOD8334R2
Onsemi
OPTOISO 4.243KV 1CH GT DVR 16SO

MPQ: 750

Lead Time: 9-12Days

-- --
8600
Total: $
C333C562JAG5TA
Kemet(Yageo)
CAP CER RAD 5.6NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
5500
Total: $
C333C512JAG5TA
Kemet(Yageo)
CAP CER RAD 5.1NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
2400
Total: $
HCPL-5150-200
Broadcom(Avago)
OPTOISO 1.5KV 1CH GATE DVR 8DIP

MPQ: 1

Lead Time: 9-12Days

-- --
6400
Total: $
501200B00000G
Boyd
HEATSINK 14-16 DIP BLACK .19"

MPQ: 1000

Lead Time: 9-12Days

-- --
4600
Total: $
C333C472JAG5TA
Kemet(Yageo)
CAP CER RAD 4.7NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
3300
Total: $
HCPL-5150-100
Broadcom(Avago)
OPTOISO 1.5KV 1CH GATE DVR 8DIP

MPQ: 1

Lead Time: 9-12Days

-- --
0
Total: $
501100B00000G
Boyd
HEATSINK 14-DIP/16-DIP

MPQ: 1000

Lead Time: 9-12Days

-- --
4300
Total: $
HCPL-5150-300
Broadcom(Avago)
OPTOISO 1.5KV 1CH GT DVR 8DIP GW

MPQ: 1

Lead Time: 9-12Days

-- --
5600
Total: $
C333C432JAG5TA
Kemet(Yageo)
CAP CER RAD 4.3NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
8900
Total: $
HCPL-5120-100
Broadcom(Avago)
OPTOISO 1.5KV 1CH GATE DRVR 8SMD

MPQ: 1

Lead Time: 9-12Days

-- --
9400
Total: $
HCPL-5120-200
Broadcom(Avago)
OPTOISO 1.5KV 1CH GATE DVR 8DIP

MPQ: 1

Lead Time: 9-12Days

-- --
1400
Total: $
C333C392JAG5TA
Kemet(Yageo)
CAP CER RAD 3.9NF 250V C0G 5%

MPQ: 250

Lead Time: 9-12Days

-- --
2500
Total: $
HCPL-5120-300
Broadcom(Avago)
OPTOISO 1.5KV 1CH GT DVR 8SMD GW

MPQ: 1

Lead Time: 9-12Days

-- --
6700
Total: $
HCPL-5151
Broadcom(Avago)
OPTOISO 1.5KV 1CH GATE DVR 8DIP

MPQ: 1

Lead Time: 9-12Days

-- --
6700
Total: $
  • 1
  • 2528
  • 2529
  • 2530
  • 2531
  • 2532
  • 6655
Go to