
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
EV-T220-38E
| Ohmite |
HEATSINK FOR TO-220
| MPQ: 10 Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
SI823H3AB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 400 | Total:
$
| |
CR101-25VE
| Ohmite |
ALUMINUM HEATSINK 25MM DEGREASED
| MPQ: 4 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
SI823H3BB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
WV-T220-101E
| Ohmite |
HEATSINK AND CLIP FOR TO-220
| MPQ: 77 Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
SI823H3CB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
219-268A-TR
| Wakefield-Vette |
TO-268 HEAT SINK ANODZD REEL
| MPQ: 250 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
SI823H4AB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
SI823H4BB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 4200 | Total:
$
| |
DV-T268-301E-TR
| Ohmite |
HEATSINK FOR TO-268
| MPQ: 200 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
533002B02551G
| Boyd |
HEATSINK TO-220 SOLDERPIN/CLIP
| MPQ: 750 Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
SI823H4CB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
529701B02500G
| Boyd |
HEATSINK TO-218 SOLDER PIN
| MPQ: 240 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
SI823H5AB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
XL25-40-40-3
| T-Global Technology |
XL25 CERAMIC BOARD 40X40X3MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
SI823H5BB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
V8813Y
| Assmann Wsw Components |
HEATSINK TO-220/TOP-3/SOT-32
| MPQ: 108 Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
SI823H5CB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
PA1-1CB
| Cts |
HEATSINK .50"H BLACK TO-220
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
SI823H6AB-IS1R
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 2500 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
|