Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HCTT3-8.000-ZTTCE-33L
Hangjing Electronic

Lead Time: 9-12Days

-- --
1300
Total: $
HCPL2531M
Onsemi
Optocoupler; THT; Ch: 2; OUT: transistor; Uinsul: 5kV; 1Mbps;

Lead Time: 9-12Days

-- --
1100
Total: $
MMPF0200F6AEP
Nxp Semiconductors
series--i.MX6--IC-11--56-HVQFN8x8

Lead Time: 9-12Days

-- --
2700
Total: $
PSPMAA0805-1R0M-ANP
Prod
24A 1uH ±20% 15A SMD,8x8.5mm

Lead Time: 9-12Days

-- --
300
Total: $
PSPNAQ3015-2R2M
Prod
1.9A 2.2uH ±20% 1.79A 1212

Lead Time: 9-12Days

-- --
8300
Total: $
SMAJ7.0CA/TR13
Yageo

Lead Time: 9-12Days

-- --
4700
Total: $
SMBJ140CA
Dowo

Lead Time: 9-12Days

-- --
6900
Total: $
SMDJ54CA
Dowo

Lead Time: 9-12Days

-- --
7100
Total: $
SMBJ3.3CA
Dowo

Lead Time: 9-12Days

-- --
7900
Total: $
S-SM340AF
Lrc
,3a40v,smafl

Lead Time: 9-12Days

-- --
6700
Total: $
XC32M4-8.000-F12NLDTL
Hangjing Electronic

Lead Time: 9-12Days

-- --
4300
Total: $
XC32M4-25.000-F18LJDT
Hangjing Electronic

Lead Time: 9-12Days

-- --
7500
Total: $
XC32M4-10.000-F10LLDT
Hangjing Electronic

Lead Time: 9-12Days

-- --
8900
Total: $
XC53G2-25.000-F20NJDTL
Hangjing Electronic

Lead Time: 9-12Days

-- --
1700
Total: $
XC32M4-40.000-F12NJDT
Hangjing Electronic

Lead Time: 9-12Days

-- --
6100
Total: $
XC22M4-25.000-F12NLDT
Hangjing Electronic

Lead Time: 9-12Days

-- --
7100
Total: $
X49ST2-8.000-F20JGDT
Hangjing Electronic

Lead Time: 9-12Days

-- --
700
Total: $
X49ST2-8.000-F18LJDTL
Hangjing Electronic

Lead Time: 9-12Days

-- --
9700
Total: $
SODHE108-SH
Lrc
1.7V 1kV 5uA 1A SOD-123FL

Lead Time: 9-12Days

-- --
7300
Total: $
TC32H4-25.000-33GNDTNL
Hangjing Electronic

Lead Time: 9-12Days

-- --
2900
Total: $
  • 1
  • 249
  • 250
  • 251
  • 252
  • 253
  • 6854
Go to