
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
HCPL-J314
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GATE DVR 8DIP
| MPQ: 50 Lead Time: 9-12Days | -- -- | 4000 | Total:
$
| |
HCPL-T250
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GATE DVR 8DIP
| MPQ: 50 Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
FOD3184TSDV
| Onsemi |
OPTOISO 5KV 1CH GATE DVR 8SMD
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
ACPL-P347-560E
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GATE DRVR 6SO
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
MTSW-107-06-T-S-000
| Samtec |
CONN HEADER VERT 7POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
PS9506L3-V-E3-AX
| Renesas |
OPTOISO 5KV 1CH GATE DVR 8DIP GW
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
HCPL-J314#500
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GT DVR 8DIP
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
HCPL-T250#500
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GT DVR 8DIP
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
HCPL-T250#060
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GATE DVR 8DIP
| MPQ: 50 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
MTSW-106-07-F-S-210
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
HCPL-T250#300
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GT DVR 8DIP
| MPQ: 50 Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
MTSW-106-07-F-S-205
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
HCPL-J314#300
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GT DVR 8DIP
| MPQ: 50 Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
MTSW-106-07-F-S-200
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
HCPL-T250#560
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GT DVR 8DIP
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
HCPL-T250#360
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GT DVR 8DIP
| MPQ: 50 Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
MTSW-106-07-F-S-190
| Samtec |
CONN HEADER VERT 6POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
SI8231AB-D-ISR
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
SI8231BB-D-ISR
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
SI8232AB-D-ISR
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 7000 | Total:
$
|