Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TC6502P085VCTTR
Microchip
THERMOSTAT 85DEGC ACT HI SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
1000
Total: $
334HC3700K2EM8
Cornell Dubilier
CAP FILM 0.33UF 700VAC CHAS MT

MPQ: 2

Lead Time: 9-12Days

-- --
800
Total: $
TC6502P095VCTTR
Microchip
THERMOSTAT 95DEGC ACT HI SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
4100
Total: $
MKP385E31012KFP2B0
Vishay
CAP FILM 10000PF 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
900
Total: $
TC6502P105VCTTR
Microchip
THERMOSTAT 105DEG ACT HI SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
2000
Total: $
MKP385E31012KFI2B0
Vishay
CAP FILM 10000PF 1.25KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
9900
Total: $
TC6502P115VCTTR
Microchip
THERMOSTAT 115DEG ACT HI SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
4600
Total: $
TC6501P055VCTTR
Microchip
THERMOSTAT 55DEGC ACT LO SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
9900
Total: $
TC6501P065VCTTR
Microchip
THERMOSTAT 65DEGC ACT LO SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
7500
Total: $
MKP385E2152AKFI2B0
Vishay
CAP FILM 1500PF 10% 2KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
8400
Total: $
TC6501P075VCTTR
Microchip
THERMOSTAT 75DEGC ACT LO SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
9100
Total: $
MKP385E2152AKFM2B0
Vishay
CAP FILM 1500PF 10% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
1200
Total: $
TC6503P005VCTTR
Microchip
THERMOSTAT 5DEGC ACT LOW SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
3600
Total: $
MKP385E2152AKFP2B0
Vishay
CAP FILM 1500PF 10% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
9600
Total: $
MKP385E31012KFM2B0
Vishay
CAP FILM 10000PF 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
7000
Total: $
TC6504P005VCTTR
Microchip
THERMOSTAT 5DEGC ACT HI SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
5700
Total: $
MKP385E31085KFI2B0
Vishay
CAP FILM 10000PF 10% 850VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
8300
Total: $
TC6501P105VCTTR
Microchip
THERMOSTAT 105DEG ACT LO SOT23-5

MPQ: 3000

Lead Time: 9-12Days

-- --
6600
Total: $
MKP385E31085KFM2B0
Vishay
CAP FILM 10000PF 10% 850VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
1200
Total: $
MKP385E31085KFP2B0
Vishay
CAP FILM 10000PF 10% 850VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
9000
Total: $
  • 1
  • 2458
  • 2459
  • 2460
  • 2461
  • 2462
  • 6655
Go to