Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385E2471AJFM2B0
Vishay
CAP FILM 4700PF 5% 1.6KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
600
Total: $
ADUM4137WBRNZ
Analog Devices
DGTL ISO 5KV 1CH GATE DVR 28SOIC

MPQ: 46

Lead Time: 9-12Days

-- --
2500
Total: $
MKP385E31812KFM2B0
Vishay
CAP FILM 0.018UF 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
2900
Total: $
SI8261AAC-C-ISR
Skyworks
DGTL ISO 3.75KV 1CH GT DVR 8SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
7700
Total: $
MKP385E3121AKFP2B0
Vishay
CAP FILM 0.012UF 10% 1.6KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
5200
Total: $
SI8232BB-D-IS
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

MPQ: 46

Lead Time: 9-12Days

-- --
2500
Total: $
MKP385E31812KFI2B0
Vishay
CAP FILM 0.018UF 1.25KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
4500
Total: $
MKP385E3121AKFI2B0
Vishay
CAP FILM 0.012UF 10% 1.6KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
3700
Total: $
MKP385E31812KFP2B0
Vishay
CAP FILM 0.018UF 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
6800
Total: $
HCPL-0302-500E
Broadcom(Avago)
OPTOISO 3.75KV 1CH GATE DVR 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
8300
Total: $
MKP385E31012JFM2B0
Vishay
CAP FILM 10000PF 5% 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
5700
Total: $
HCPL-0314-500E
Broadcom(Avago)
OPTOISO 3.75KV 1CH GATE DVR 8SO

MPQ: 1500

Lead Time: 9-12Days

-- --
2400
Total: $
MKP385E31012JFI2B0
Vishay
CAP FILM 10000PF 5% 1.25KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
2100
Total: $
MKP385E31012JFP2B0
Vishay
CAP FILM 10000PF 5% 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
6200
Total: $
MKP385E2561AKF02W0
Vishay
CAP FILM 5600PF 10% 1.6KVDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
8300
Total: $
F340Y231230KFM2B0
Vishay
CAP FILM 0.012UF 10% 1KVDC RAD

MPQ: 1250

Lead Time: 9-12Days

-- --
5200
Total: $
F340Y231230KFP2B0
Vishay
CAP FILM 0.012UF 10% 1KVDC RAD

MPQ: 1250

Lead Time: 9-12Days

-- --
2400
Total: $
F340Y231230KFI2B0
Vishay
CAP FILM 0.012UF 10% 1KVDC RAD

MPQ: 1000

Lead Time: 9-12Days

-- --
8200
Total: $
MKP385E38240KFM2B0
Vishay
CAP FILM 0.08UF 10% 400VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
4200
Total: $
FOD3184TSR2V
Onsemi
OPTOISO 5KV 1CH GATE DVR 8SMD

Lead Time: 9-12Days

-- --
6900
Total: $
  • 1
  • 2444
  • 2445
  • 2446
  • 2447
  • 2448
  • 6670
Go to