Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SI8273BB-IS1R
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
6400
Total: $
SI8273GB-IS1R
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
5800
Total: $
MKP385E28212JFI2B0
Vishay
CAP FILM 8200PF 5% 1.25KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
9500
Total: $
MKP385E2562AKFM2B0
Vishay
CAP FILM 5600PF 10% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
2500
Total: $
MKP385E28212JFP2B0
Vishay
CAP FILM 8200PF 5% 1.25KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
6900
Total: $
ACPL-337J-000E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 16SO

MPQ: 45

Lead Time: 9-12Days

-- --
700
Total: $
MKP385E2562AKFI2B0
Vishay
CAP FILM 5600PF 10% 2KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
4300
Total: $
SI8237AB-D-IS1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 16SOIC

MPQ: 48

Lead Time: 9-12Days

-- --
5600
Total: $
MKP385E2122AJFP2B0
Vishay
CAP FILM 1200PF 5% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
2200
Total: $
MKP385E31585JFP2B0
Vishay
CAP FILM 0.015UF 5% 850VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
5400
Total: $
HCPL-3180-000E
Broadcom(Avago)
OPTOISO 3.75KV 1CH GATE DVR 8DIP

MPQ: 50

Lead Time: 9-12Days

-- --
6800
Total: $
F340Y231030JFM2B0
Vishay
CAP FILM 10000PF 5% 1KVDC RAD

MPQ: 1250

Lead Time: 9-12Days

-- --
7600
Total: $
ADUM3123BRZ
Analog Devices
DGTL ISO 3KV 1CH GATE DVR 8SOIC

MPQ: 98

Lead Time: 9-12Days

-- --
8200
Total: $
MKP385E31585JFM2B0
Vishay
CAP FILM 0.015UF 5% 850VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
1800
Total: $
ADUM4120ARIZ
Analog Devices
DGTL ISO 5KV 1CH GATE DRVR 6SOIC

MPQ: 100

Lead Time: 9-12Days

-- --
3700
Total: $
MKP385E2122AJFM2B0
Vishay
CAP FILM 1200PF 5% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
6200
Total: $
HCPL-5120
Broadcom(Avago)
OPTOISO 1.5KV 1CH GATE DVR 8DIP

MPQ: 1

Lead Time: 9-12Days

-- --
3200
Total: $
MKP385E31585JFI2B0
Vishay
CAP FILM 0.015UF 5% 850VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
9200
Total: $
SI8220CB-D-IS
Skyworks
DGTL ISO 2.5KV 1CH GT DVR 8SOIC

MPQ: 96

Lead Time: 9-12Days

-- --
5100
Total: $
F340Y231030JFP2B0
Vishay
CAP FILM 10000PF 5% 1KVDC RAD

MPQ: 1250

Lead Time: 9-12Days

-- --
8000
Total: $
  • 1
  • 2444
  • 2445
  • 2446
  • 2447
  • 2448
  • 6655
Go to