Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SI8234BB-D-IM1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 14QFN

MPQ: 490

Lead Time: 9-12Days

-- --
8300
Total: $
204HC3B102K2SM6
Cornell Dubilier
CAP FILM 0.2UF 10% 1KVAC CHASSIS

MPQ: 2

Lead Time: 9-12Days

-- --
3700
Total: $
SI8235BB-D-IM1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 14QFN

MPQ: 490

Lead Time: 9-12Days

-- --
4000
Total: $
135HC3B600K2SM6
Cornell Dubilier
CAP FILM 1.32UF 10% 600VAC CHASS

MPQ: 2

Lead Time: 9-12Days

-- --
9900
Total: $
SI8234AB-D-IM1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 14QFN

MPQ: 490

Lead Time: 9-12Days

-- --
3900
Total: $
SI8233AB-D-IM1
Skyworks
DGTL ISO 2.5KV 2CH GT DVR 14QFN

MPQ: 490

Lead Time: 9-12Days

-- --
2300
Total: $
125HC3B600K2SM6
Cornell Dubilier
CAP FILM 1.2UF 10% 600VAC CHASSI

MPQ: 2

Lead Time: 9-12Days

-- --
9500
Total: $
105HC3B600K2SM6
Cornell Dubilier
CAP FILM 1UF 10% 600VAC CHASSIS

MPQ: 2

Lead Time: 9-12Days

-- --
9800
Total: $
104HC3B102K2SM6
Cornell Dubilier
CAP FILM 0.1UF 10% 1KVAC CHASSIS

MPQ: 2

Lead Time: 9-12Days

-- --
400
Total: $
MKP385E2392AJFI2B0
Vishay
CAP FILM 3900PF 5% 2KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
8500
Total: $
MKP385E2392AJFM2B0
Vishay
CAP FILM 3900PF 5% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
4300
Total: $
MKP385E2392AJFP2B0
Vishay
CAP FILM 3900PF 5% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
3100
Total: $
MKP385E2272AJFM2B0
Vishay
CAP FILM 2700PF 5% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
2800
Total: $
MKP385E2272AJFP2B0
Vishay
CAP FILM 2700PF 5% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
7100
Total: $
ACPL-P347-000E
Broadcom(Avago)
OPTOISO 3.75KV 1CH GATE DRVR 6SO

MPQ: 100

Lead Time: 9-12Days

-- --
2200
Total: $
MKP385E2272AJFI2B0
Vishay
CAP FILM 2700PF 5% 2KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
6900
Total: $
ACPL-P347-060E
Broadcom(Avago)
OPTOISO 3.75KV 1CH GATE DRVR 6SO

MPQ: 100

Lead Time: 9-12Days

-- --
1400
Total: $
MKP385E2222AJFI2B0
Vishay
CAP FILM 2200PF 5% 2KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
8000
Total: $
MKP385E2222AJFP2B0
Vishay
CAP FILM 2200PF 5% 2KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
7800
Total: $
ACPL-335J-000E
Broadcom(Avago)
OPTOISO 5KV 1CH GATE DVR 16SO

MPQ: 45

Lead Time: 9-12Days

-- --
9100
Total: $
  • 1
  • 2442
  • 2443
  • 2444
  • 2445
  • 2446
  • 6670
Go to