Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PDTD113ES,126
Nxp Semiconductors
TRANS PREBIAS NPN 50V TO92-3

MPQ: 2000

Lead Time: 9-12Days

-- --
2100
Total: $
MKP385E2392AJF02W0
Vishay
CAP FILM 3900PF 5% 2KVDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
7700
Total: $
PDTD113ZS,126
Nxp Semiconductors
TRANS PREBIAS NPN 50V TO92-3

MPQ: 2000

Lead Time: 9-12Days

-- --
1000
Total: $
MKP385E33363JFI2B0
Vishay
CAP FILM 0.033UF 5% 630VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
2500
Total: $
PDTD123ES,126
Nxp Semiconductors
TRANS PREBIAS NPN 50V TO92-3

MPQ: 2000

Lead Time: 9-12Days

-- --
0
Total: $
MKP385E41040KF02W0
Vishay
CAP FILM 0.1UF 10% 400VDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
4500
Total: $
MKP385E33363JFP2B0
Vishay
CAP FILM 0.033UF 5% 630VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
4600
Total: $
PDTD123TK,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.5A SMT3

MPQ: 3000

Lead Time: 9-12Days

-- --
8600
Total: $
PDTD123YS,126
Nxp Semiconductors
TRANS PREBIAS NPN 50V TO92-3

MPQ: 2000

Lead Time: 9-12Days

-- --
3900
Total: $
PDTC144WS,126
Nxp Semiconductors
TRANS PREBIAS NPN 50V TO92-3

MPQ: 2000

Lead Time: 9-12Days

-- --
0
Total: $
MKP385E33363JFM2B0
Vishay
CAP FILM 0.033UF 5% 630VDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
8000
Total: $
PDTD113EK,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.5A SMT3

MPQ: 3000

Lead Time: 9-12Days

-- --
6200
Total: $
MKP385E2471AJF02W0
Vishay
CAP FILM 4700PF 5% 1.6KVDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
6800
Total: $
PDTD113ZK,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.5A SMT3

MPQ: 3000

Lead Time: 9-12Days

-- --
500
Total: $
MKP385E3151AKFP2B0
Vishay
CAP FILM 0.015UF 10% 1.6KVDC RAD

MPQ: 750

Lead Time: 9-12Days

-- --
300
Total: $
PDTD123EK,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.5A SMT3

MPQ: 3000

Lead Time: 9-12Days

-- --
900
Total: $
MKP385E3121AKF02W0
Vishay
CAP FILM 0.012UF 10% 1.6KVDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
4400
Total: $
PDTD123YK,115
Nxp Semiconductors
TRANS PREBIAS NPN 50V 0.5A SMT3

MPQ: 3000

Lead Time: 9-12Days

-- --
7400
Total: $
MKP385E3151AKFI2B0
Vishay
CAP FILM 0.015UF 10% 1.6KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
1000
Total: $
PBRN113EK,115
Nxp Semiconductors
TRANS PREBIAS NPN 40V 0.6A SMT3

MPQ: 3000

Lead Time: 9-12Days

-- --
1100
Total: $
  • 1
  • 2431
  • 2432
  • 2433
  • 2434
  • 2435
  • 6655
Go to