Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SM712-02HTG
Hjke/

Lead Time: 9-12Days

-- --
300
Total: $
SM24CANA-02HTG
Hjke/

Lead Time: 9-12Days

-- --
7300
Total: $
TLV70433DBVR
Hjke/

Lead Time: 9-12Days

-- --
100
Total: $
ESDCAN24-2BLY
Hjke/

Lead Time: 9-12Days

-- --
5500
Total: $
ESDLIN1524BJ
Hjke/

Lead Time: 9-12Days

-- --
2300
Total: $
ET3157-H
Hjke/

Lead Time: 9-12Days

-- --
5300
Total: $
ESDA6V1L
Hjke/

Lead Time: 9-12Days

-- --
4700
Total: $
ESDA5V3L
Hjke/

Lead Time: 9-12Days

-- --
6300
Total: $
ESDA6V1-5W6
Hjke/

Lead Time: 9-12Days

-- --
6700
Total: $
ESD5Z5.0T1G
Hjke/

Lead Time: 9-12Days

-- --
6900
Total: $
ESD5B5.0ST1G
Hjke/

Lead Time: 9-12Days

-- --
8900
Total: $
ESD03V32D-LC
Hjke/

Lead Time: 9-12Days

-- --
3900
Total: $
MCP6001T-I/OT
Hjke/

Lead Time: 9-12Days

-- --
7100
Total: $
MCP1700T-3302E/TT
Hjke/

Lead Time: 9-12Days

-- --
9500
Total: $
MMA02040C4708FB300
Vishay
Res Thin Film 0204(1406) 4.7 Ohm 1% 0.25W(1/4W) ±50ppm/°C Sulfur Resistant Melf Pad SMD T/R Automotive AEC-Q200 Medical

Lead Time: 9-12Days

-- --
1900
Total: $
PSR05-LF-T7
Hjke/

Lead Time: 9-12Days

-- --
8500
Total: $
PSD15C-LF-T7
Hjke/

Lead Time: 9-12Days

-- --
3700
Total: $
SMF05CT1G
Hjke/

Lead Time: 9-12Days

-- --
6500
Total: $
T51D107M010C0040
Vishay
10V ±20% 100uF 40mΩ@100kHz

Lead Time: 9-12Days

-- --
1700
Total: $
TPD1E10B06DPYR
Hjke/

Lead Time: 9-12Days

-- --
2900
Total: $
  • 1
  • 236
  • 237
  • 238
  • 239
  • 240
  • 6854
Go to