
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
MKP385E32210JFP2B0
| Vishay |
CAP FILM 0.022UF 5% 1KVDC RAD
| MPQ: 750 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
782202F00000G
| Boyd |
78220 EXTRUSION 2.36X1.18"X4.1'
| MPQ: 1 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
M22-2521046
| Harwin |
CONN HEADER VERT 20POS 2MM
| MPQ: 300 Lead Time: 9-12Days | -- -- | 4200 | Total:
$
| |
MKP385E3101AKII2B0
| Vishay |
CAP FILM 10000PF 10% 1.6KVDC RAD
| MPQ: 250 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
M20-9981746
| Harwin |
CONN HEADER VERT 34POS 2.54MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
622002F00000G
| Boyd |
62200 EXTRUSION 0.85X3.5"X4'
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
MKP385E34763JFP2B0
| Vishay |
CAP FILM 0.047UF 5% 630VDC RAD
| MPQ: 750 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
MKP385E32210JFI2B0
| Vishay |
CAP FILM 0.022UF 5% 1KVDC RAD
| MPQ: 500 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
MKP385E34763JFM2B0
| Vishay |
CAP FILM 0.047UF 5% 630VDC RAD
| MPQ: 750 Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
FJN3314RBU
| Onsemi |
TRANS PREBIAS NPN 50V TO92-3
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
10147606-00017LF
| Amphenol |
CONN 1.0 R/A SMT HDR
| MPQ: 1700 Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
HCPL-0314-000E
| Broadcom(Avago) |
OPTOISO 3.75KV 1CH GATE DVR 8SO
| MPQ: 100 Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
MKP385E32210JFM2B0
| Vishay |
CAP FILM 0.022UF 5% 1KVDC RAD
| MPQ: 750 Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
FJN3306RBU
| Onsemi |
TRANS PREBIAS NPN 50V TO92-3
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 200 | Total:
$
| |
0026580105
| Molex |
CONN HEADER VERT 10POS 3.96MM
| MPQ: 200 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
MKP385E35663JFI2B0
| Vishay |
CAP FILM 0.056UF 5% 630VDC RAD
| MPQ: 500 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
10129380-914002ALF
| Amphenol |
CONN HEADER SMD 14POS 2.54MM
| MPQ: 150 Lead Time: 9-12Days | -- -- | 3700 | Total:
$
| |
MKP385E35663JFM2B0
| Vishay |
CAP FILM 0.056UF 5% 630VDC RAD
| MPQ: 750 Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
SI8274AB1-IS1
| Skyworks |
DGTL ISO 2.5KV 2CH GT DVR 16SOIC
| MPQ: 48 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
7-292208-2
| Te Connectivity |
CONN HEADER VERT 22POS 1.5MM
| MPQ: 2600 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
|