
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
SI88244BC-ISR
| Skyworks |
DGTL ISOLTR 3.75KV 4CH GP 20SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
135HC6700K2EM8
| Cornell Dubilier |
CAP FILM 1.33UF 700VAC CHAS MT
| MPQ: 2 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
SI88344BC-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 24-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 8400 | Total:
$
| |
634-20ABPE
| Wakefield-Vette |
HEATSINK TO-220 VERT MT BLK 2"
| MPQ: 600 Lead Time: 9-12Days | -- -- | 9200 | Total:
$
| |
SI88444BC-IS
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 38 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
MKP385E35610KII2B0
| Vishay |
CAP FILM 0.056UF 10% 1KVDC RAD
| MPQ: 250 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
WAVE-23-165
| Wakefield-Vette |
ANCHOR HEATSINK 23X23X16.5MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
SI88440BC-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
HTSW-104-07-TM-D
| Samtec |
CONN HEADER VERT 8POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2300 | Total:
$
| |
SI88341BC-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 24-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
MKP385E34785KII2B0
| Vishay |
CAP FILM 0.047UF 10% 850VDC RAD
| MPQ: 250 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
SI88440BC-IS
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 38 Lead Time: 9-12Days | -- -- | 8500 | Total:
$
| |
HTSW-104-07-T-D
| Samtec |
CONN HEADER VERT 8POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 8200 | Total:
$
| |
MKP385E33963JF02W0
| Vishay |
CAP FILM 0.039UF 5% 630VDC RAD
| MPQ: 800 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
SI88441BC-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
HTSW-204-07-T-S
| Samtec |
CONN HEADER VERT 4POS 5.08MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6600 | Total:
$
| |
MKP385E2681AJF02W0
| Vishay |
CAP FILM 6800PF 5% 1.6KVDC RAD
| MPQ: 800 Lead Time: 9-12Days | -- -- | 1400 | Total:
$
| |
DF1BZ-13P-2.5DSA
| Hirose Electric Co.,Ltd. |
CONN HEADER VERT 13POS 2.5MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
WAVE-23-125
| Wakefield-Vette |
ANCHOR HEATSINK 23X23X12.5MM
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 6800 | Total:
$
| |
MKP385E2821AJF02W0
| Vishay |
CAP FILM 8200PF 5% 1.6KVDC RAD
| MPQ: 800 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
|