Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SI8712BD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
8000
Total: $
ATS-61270K-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 27X27X14.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8712CD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
900
Total: $
MKP385E34785KFI2B0
Vishay
CAP FILM 0.047UF 10% 850VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
9600
Total: $
SI8711AD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
4300
Total: $
TSW-105-10-F-S-RA
Samtec
CONN HEADER R/A 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
800
Total: $
ATS-61400D-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 40X40X9.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8711BD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
7600
Total: $
F340Y231530JF02W0
Vishay
CAP FILM 0.015UF 5% 1KVDC RAD

MPQ: 1100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8711CD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
2700
Total: $
SI8712AD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
9200
Total: $
ATS-56004-C1-R0
Advanced Thermal Solutions Inc
HEAT SINK 40MM X 30MM X 5MM

MPQ: 100

Lead Time: 9-12Days

-- --
9200
Total: $
SI8711AD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
9900
Total: $
SI8711BD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
200
Total: $
MKP385E34763JF02W0
Vishay
CAP FILM 0.047UF 5% 630VDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
9200
Total: $
SI8711CD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
9600
Total: $
SI8712AD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
4100
Total: $
ATS-51290R-C1-R0
Advanced Thermal Solutions Inc
HEAT SINK 29MM X 29MM X 19.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
5600
Total: $
MKP385E3101AKI02W0
Vishay
CAP FILM 10000PF 10% 1.6KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
2400
Total: $
SI8712BD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
5400
Total: $
  • 1
  • 2318
  • 2319
  • 2320
  • 2321
  • 2322
  • 6655
Go to