Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
APT75DL120HJ
Microchip
BRIDGE RECT 1P 1.2KV 75A SOT-227

MPQ: 1

Lead Time: 9-12Days

-- --
1300
Total: $
APTDF30H601G
Microchip
BRIDGE RECT 1PHASE 600V 42A SP1

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
APTDF30H1201G
Microchip
BRIDGE RECT 1PHASE 1.2KV 43A SP1

MPQ: 1

Lead Time: 9-12Days

-- --
7700
Total: $
APT75DF170HJ
Microchip
BRIDGE RECT 1P 1.7KV 75A SOT-227

MPQ: 1

Lead Time: 9-12Days

-- --
3200
Total: $
APTDF60H601G
Microchip
BRIDGE RECT 1PHASE 600V 92A SP1

MPQ: 1

Lead Time: 9-12Days

-- --
2100
Total: $
ATS-15C-170-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 30X30X15MM R-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
2300
Total: $
APTDF60H1201G
Microchip
BRIDGE RECT 1PHASE 1.2KV 82A SP1

MPQ: 1

Lead Time: 9-12Days

-- --
7000
Total: $
APTDF100H601G
Microchip
BRIDGE RECT 1PHASE 600V 135A SP1

MPQ: 1

Lead Time: 9-12Days

-- --
2100
Total: $
APTDR40X1601G
Microchip
BRIDGE RECT 3PHASE 1.6KV 40A SP1

MPQ: 1

Lead Time: 9-12Days

-- --
9100
Total: $
ATS-15C-142-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 30X30X15MM L-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
800
Total: $
APTDF100H20G
Microchip
BRIDGE RECT 1PHASE 200V 145A SP4

MPQ: 1

Lead Time: 9-12Days

-- --
4500
Total: $
ATS-14C-170-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 30X30X15MM R-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
4900
Total: $
APTDF100H100G
Microchip
BRIDGE RECT 1PHASE 1KV 130A SP4

MPQ: 1

Lead Time: 9-12Days

-- --
5700
Total: $
ATS-14C-142-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 30X30X15MM L-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
4100
Total: $
ATS-13C-170-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 30X30X15MM R-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
9200
Total: $
APTDR90X1601G
Microchip
BRIDGE RECT 3PHASE 1.6KV 90A SP1

MPQ: 1

Lead Time: 9-12Days

-- --
6900
Total: $
DDB6U104N16RRB37BOSA1
Infineon
MOD DIODE BRIDGE ECONO2-7

MPQ: 10

Lead Time: 9-12Days

-- --
8500
Total: $
DDB6U104N16RRPB37BPSA1
Infineon
BRIDGE RECT 3P 1.6KV 35A ECONO27

MPQ: 10

Lead Time: 9-12Days

-- --
6800
Total: $
ATS-13C-142-C2-R0
Advanced Thermal Solutions Inc
HEATSINK 30X30X15MM L-TAB T766

MPQ: 25

Lead Time: 9-12Days

-- --
8300
Total: $
MTMM-103-08-T-D-130
Samtec
CONN HEADER VERT 6POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
3100
Total: $
  • 1
  • 229
  • 230
  • 231
  • 232
  • 233
  • 6654
Go to