Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ATS-X53170K-C1-R0
Advanced Thermal Solutions Inc
STR FIN 16.25X16.25X14.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
5900
Total: $
SI88241BC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
400
Total: $
9-2232043-5
Te Connectivity
CONN HEADER VERT 5POS 5MM

MPQ: 1200

Lead Time: 9-12Days

-- --
2800
Total: $
SI88242BC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
7800
Total: $
ATS-X53310D-C1-R0
Advanced Thermal Solutions Inc
STR FIN 30.25X30.25X9.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
2500
Total: $
SI88243BC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
9700
Total: $
4-2232045-4
Te Connectivity
CONN HEADER VERT 4POS 5MM

MPQ: 1600

Lead Time: 9-12Days

-- --
5000
Total: $
SI88640EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 24-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
4700
Total: $
ATS-X51230D-C1-R0
Advanced Thermal Solutions Inc
MAXIFLOW 22.25X22.25X9.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
3200
Total: $
SI88641EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 24-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
4700
Total: $
SI88643EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 24-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
2800
Total: $
SI88644EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 24-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
8100
Total: $
ATS-X53150K-C1-R0
Advanced Thermal Solutions Inc
STR FIN 14.25X14.25X14.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
3200
Total: $
ADUM1100BR
Analog Devices
DGTL ISOLTR 2.5KV 1CH GP 8-SOIC

MPQ: 98

Lead Time: 9-12Days

-- --
2100
Total: $
ATS-X53300D-C1-R0
Advanced Thermal Solutions Inc
STR FIN 29.25X29.25X9.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
9400
Total: $
ADUM3211WBRZ
Analog Devices
DGTL ISOLTR 2.5KV 2CH GP 8-SOIC

MPQ: 98

Lead Time: 9-12Days

-- --
6800
Total: $
ADUM3152BRSZ-RL7
Analog Devices
DGTL ISO 3.75KV 7CH SPI 20-SSOP

MPQ: 500

Lead Time: 9-12Days

-- --
9100
Total: $
ATS-X51210D-C1-R0
Advanced Thermal Solutions Inc
MAXIFLOW 20.25X20.25X9.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
5600
Total: $
ADUM3153BRSZ-RL7
Analog Devices
DGTL ISO 3.75KV 7CH SPI 20-SSOP

MPQ: 500

Lead Time: 9-12Days

-- --
8800
Total: $
MAX14935DAWE+
Analog Devices
DGTL ISO 5KV 4CH RS232 16-SOIC

MPQ: 46

Lead Time: 9-12Days

-- --
3200
Total: $
  • 1
  • 2250
  • 2251
  • 2252
  • 2253
  • 2254
  • 6655
Go to