
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
ADUM3153ARSZ
| Analog Devices |
DGTL ISO 3.75KV 7CH SPI 20-SSOP
| MPQ: 66 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
SI88440BD-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
SI88441BD-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
ATS-X51300D-C1-R0
| Advanced Thermal Solutions Inc |
MAXIFLOW 29.25X29.25X9.5MM T766
| MPQ: 100 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
SI88442BD-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 7600 | Total:
$
| |
69157-216HLF
| Amphenol |
CONN HEADER VERT 16POS 2.54MM
| MPQ: 300 Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
125283
| Wakefield-Vette |
1.1WX12" EXTRUSI 16240 XX8052-65
| MPQ: 50 Lead Time: 9-12Days | -- -- | 9800 | Total:
$
| |
SI88443BD-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
350-80-106-00-206191
| Preci-Dip |
CONN HEADER SMD R/A 6POS 2.54MM
| MPQ: 1500 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
SI88444BD-ISR
| Skyworks |
DGTL ISOLTR 5KV 4CH GP 20-SOIC
| MPQ: 1250 Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
ATS-X53230K-C1-R0
| Advanced Thermal Solutions Inc |
STR FIN 22.25X22.25X14.5MM T766
| MPQ: 100 Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
ADUM3200WBRZ
| Analog Devices |
DGTL ISOLTR 2.5KV 2CH GP 8-SOIC
| MPQ: 98 Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
ATS-X51290D-C1-R0
| Advanced Thermal Solutions Inc |
MAXIFLOW 28.25X28.25X9.5MM T766
| MPQ: 100 Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
ADUM3201WBRZ
| Analog Devices |
DGTL ISOLTR 2.5KV 2CH GP 8-SOIC
| MPQ: 98 Lead Time: 9-12Days | -- -- | 2700 | Total:
$
| |
ADUM3211TRZ-EP-RL7
| Analog Devices |
DGTL ISOLTR 2.5KV 2CH GP 8-SOIC
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
ADUM3201TRZ-EP-RL7
| Analog Devices |
DGTL ISOLTR 2.5KV 2CH GP 8-SOIC
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
57202-G52-03TRLF
| Amphenol |
CONN HEADER SMD 6POS 2MM
| MPQ: 750 Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
ADUM5210BRSZ-RL7
| Analog Devices |
DGTL ISOLTR 2.5KV 2CH GP 20-SSOP
| MPQ: 500 Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
ATS-X53375D-C1-R0
| Advanced Thermal Solutions Inc |
STR FIN 36.75X36.75X9.5MM T766
| MPQ: 100 Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
ADUM5212BRSZ-RL7
| Analog Devices |
DGTL ISOLTR 2.5KV 2CH GP 20-SSOP
| MPQ: 500 Lead Time: 9-12Days | -- -- | 5300 | Total:
$
|