Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TLV70433DBVR
Hjke/

Lead Time: 9-12Days

-- --
100
Total: $
AP2112K-3.3TRG1
Hjke/

Lead Time: 9-12Days

-- --
9900
Total: $
ESD03V32D-LC
Hjke/

Lead Time: 9-12Days

-- --
3900
Total: $
LESD3Z5.0CMT1G
Hjke/

Lead Time: 9-12Days

-- --
9100
Total: $
LESD5Z5.0CT1G
Hjke/

Lead Time: 9-12Days

-- --
5700
Total: $
NUP4202W1T2G
Hjke/

Lead Time: 9-12Days

-- --
7300
Total: $
SD05C-01FTG
Hjke/

Lead Time: 9-12Days

-- --
6500
Total: $
SDT23C712L02
Hjke/

Lead Time: 9-12Days

-- --
6700
Total: $
T51D107M010C0040
Vishay
10V ±20% 100uF 40mΩ@100kHz

Lead Time: 9-12Days

-- --
1700
Total: $
MMA02040C4708FB300
Vishay
Res Thin Film 0204(1406) 4.7 Ohm 1% 0.25W(1/4W) ±50ppm/°C Sulfur Resistant Melf Pad SMD T/R Automotive AEC-Q200 Medical

Lead Time: 9-12Days

-- --
1900
Total: $
RT9193-33GB
Hjke/

Lead Time: 9-12Days

-- --
9300
Total: $
RT9013-28GB
Hjke/

Lead Time: 9-12Days

-- --
9300
Total: $
SRV05-4HTG
Hjke/

Lead Time: 9-12Days

-- --
7900
Total: $
SPX3819M5-L-5-0/TR
Hjke/

Lead Time: 9-12Days

-- --
700
Total: $
SPX5205M5-L-5-0/TR
Hjke/

Lead Time: 9-12Days

-- --
9100
Total: $
AZ1045-04F
Hjke/

Lead Time: 9-12Days

-- --
7900
Total: $
AZ5825-01F
Hjke/

Lead Time: 9-12Days

-- --
2900
Total: $
AZC199-04S
Hjke/

Lead Time: 9-12Days

-- --
3500
Total: $
BV05C
Hjke/

Lead Time: 9-12Days

-- --
4500
Total: $
CDSOT23-SM712
Hjke/

Lead Time: 9-12Days

-- --
900
Total: $
  • 1
  • 217
  • 218
  • 219
  • 220
  • 221
  • 6755
Go to