Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TJ-S1615SW6TGLCCSRGB-A5
Togialed

Lead Time: 9-12Days

-- --
2900
Total: $
TJ-S1608CY6T5ALC6B-A5
Togialed

Lead Time: 9-12Days

-- --
3500
Total: $
TJ-S2012CY8T5ALC2G-A5
Togialed

Lead Time: 9-12Days

-- --
5100
Total: $
TJ-L3FYTGHYMCGSFLC9Y-A5
Togialed

Lead Time: 9-12Days

-- --
6500
Total: $
TJ-L3FYTXHTCSLC2R2G-A5
Togialed

Lead Time: 9-12Days

-- --
7500
Total: $
TJ-L3FYTXHMCYLC2R7K-A5
Togialed

Lead Time: 9-12Days

-- --
7700
Total: $
TJ-L5FYTGHKMCGLFLC7K-A5
Togialed

Lead Time: 9-12Days

-- --
7900
Total: $
SIT1057T
Sit

Lead Time: 9-12Days

-- --
700
Total: $
LQH32PB100MNCL
Murata
FIXED IND 10UH 450MA 354 MOHM

Lead Time: 9-12Days

-- --
1100
Total: $
HCB1608KF-301T20
Tai-Tech
300Ω@100MHz 200mΩ ±25% 2A 0603

Lead Time: 9-12Days

-- --
1300
Total: $
EEEFT0J221AR
Panasonic
6.3V ±20% 240mA@100kHz 220uF SMD,D5xL5.8mm

Lead Time: 9-12Days

-- --
1300
Total: $
RB520S-30-MS
Msksemi

Lead Time: 9-12Days

-- --
1500
Total: $
LQG15WH2N1B02D
Murata
2.1nH----1A-60--04021005--

Lead Time: 9-12Days

-- --
100
Total: $
225RV0055
Knscha

Lead Time: 9-12Days

-- --
500
Total: $
USB4105-GF-A
Gct (Global Connector Technology)
Socket; USB C; SMT; PIN: 16; horizontal; top board mount; USB 2.0

Lead Time: 9-12Days

-- --
900
Total: $
CL21B105KBFNNNG
Samsung
1µF-±10%-50V--X7R-08052012-

Lead Time: 9-12Days

-- --
300
Total: $
CDRH127NP-330MC
Sumida
64.8mΩ 33uH ±20% 3A

Lead Time: 9-12Days

-- --
9300
Total: $
AMP0503H100MT
Sunlord

Lead Time: 9-12Days

-- --
9700
Total: $
RC0805FR-0712K1L
Yageo
RES SMD 12.1K OHM 1% 1/8W 0805

Lead Time: 9-12Days

-- --
1700
Total: $
SDWL1608C33NJSTF
Sunlord
33nH ±5% 0603 470mA

Lead Time: 9-12Days

-- --
700
Total: $
  • 1
  • 215
  • 216
  • 217
  • 218
  • 219
  • 6854
Go to