
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
ADN4651BRSZ
| Analog Devices |
DGTL ISO 3.75KV 2CH LVDS 20-SSOP
| MPQ: 66 Lead Time: 9-12Days | -- -- | 7800 | Total:
$
| |
ADUM5202CRWZ
| Analog Devices |
DGTL ISOLTR 2.5KV 2CH GP 16-SOIC
| MPQ: 47 Lead Time: 9-12Days | -- -- | 1500 | Total:
$
| |
ADN4654BRSZ
| Analog Devices |
DGTL ISO 3.75KV 2CH LVDS 20-SSOP
| MPQ: 66 Lead Time: 9-12Days | -- -- | 9600 | Total:
$
| |
ADUM6200CRWZ
| Analog Devices |
DGTL ISOLTR 5KV 2CH GP 16-SOIC
| MPQ: 47 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
ADN4655BRWZ
| Analog Devices |
DGTL ISOLTR 5KV 2CH LVDS 20-SOIC
| MPQ: 37 Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
ADN4654BRWZ
| Analog Devices |
DGTL ISOLTR 5KV 2CH LVDS 20-SOIC
| MPQ: 37 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
ADUM3400TRWZ-EP
| Analog Devices |
DGTL ISOLTR 2.5KV 4CH GP 16-SOIC
| MPQ: 47 Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
ADUM5402WCRWZ-1
| Analog Devices |
DGTL ISOLTR 2.5KV 4CH GP 16-SOIC
| MPQ: 47 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
LTM2882HY-5#PBF
| Analog Devices |
DGTL ISO 2.5KV 4CH RS232 32-BBGA
| MPQ: 119 Lead Time: 9-12Days | -- -- | 1200 | Total:
$
| |
SI8710CC-B-IP
| Skyworks |
DGTL ISOLTR 3.75KV 1CH GP 8-SMD
| MPQ: 50 Lead Time: 9-12Days | -- -- | 5800 | Total:
$
| |
SI8711BC-B-IS
| Skyworks |
DGTL ISOLTR 3.75KV 1CH GP 8-SOIC
| MPQ: 96 Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
SI8716BC-A-IS
| Skyworks |
DGTL ISOLTR 3.75KV 1CH GP 8-SOIC
| MPQ: 96 Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
SI8717BC-A-IS
| Skyworks |
DGTL ISOLTR 3.75KV 1CH GP 8-SOIC
| MPQ: 96 Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
SI8610BD-B-IS
| Skyworks |
DGTL ISOLTR 5KV 1CH GP 16-SOIC
| MPQ: 46 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
SI8030AA-B-IU
| Skyworks |
DGTL ISOLTR 1KV 3CH GP 16-SSOP
| MPQ: 96 Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
SI8631AB-B-IS
| Skyworks |
DGTL ISOLTR 2.5KV 3CH GP 16-SOIC
| MPQ: 46 Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
SI8630AB-B-IS
| Skyworks |
DGTL ISOLTR 2.5KV 3CH GP 16-SOIC
| MPQ: 46 Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
MTMM-103-11-F-S-410
| Samtec |
CONN HEADER VERT 3POS 2MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| |
MTMM-103-11-F-S-100
| Samtec |
CONN HEADER VERT 3POS 2MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
MTMM-103-11-F-S-014
| Samtec |
CONN HEADER VERT 3POS 2MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
|