Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TXS0104EDR(LX)
Lx
/ TXS0104EDRLX SOP-14

Lead Time: 9-12Days

-- --
8100
Total: $
CGA0402C0G220J500GT
Hre

Lead Time: 9-12Days

-- --
2100
Total: $
CGA0402X5R475M250GT
Hre
MLCC 25V ±20% 4.7uF X5R 0402

Lead Time: 9-12Days

-- --
2300
Total: $
CGA0402X5R106M100GT
Hre
MLCC 10V ±20% 10uF X5R 0402

Lead Time: 9-12Days

-- --
2500
Total: $
CGA0603COG101J500JT
Hre
MLCC 50V ±5% 100pF C0G 0603

Lead Time: 9-12Days

-- --
3100
Total: $
CGA0603X5R475K250JT
Hre
MLCC 25V ±10% 4.7uF X5R 0603

Lead Time: 9-12Days

-- --
4500
Total: $
CGA0603C0G220J500JT
Hre

Lead Time: 9-12Days

-- --
4900
Total: $
CGA0603X5R106K100JT
Hre
MLCC 10V ±10% 10uF X5R 0603

Lead Time: 9-12Days

-- --
5900
Total: $
CGA0603X5R106M350JT
Hre
MLCC 35V ±20% 10uF X5R 0603

Lead Time: 9-12Days

-- --
6500
Total: $
CGA0603X5R106K250JT
Hre
MLCC 25V ±10% 10uF X5R 0603

Lead Time: 9-12Days

-- --
1300
Total: $
CGA0805X5R226M250MT
Hre
MLCC 25V ±20% 22uF X5R 0805

Lead Time: 9-12Days

-- --
7900
Total: $
CGA0805X5R106K500MT
Hre
MLCC 50V ±10% 10uF X5R 0805

Lead Time: 9-12Days

-- --
8100
Total: $
CGA0603X5R475K100JT
Hre
MLCC 10V ±10% 4.7uF X5R 0603

Lead Time: 9-12Days

-- --
4300
Total: $
CGA0603X7R474K500JT
Hre

Lead Time: 9-12Days

-- --
5100
Total: $
CGA0805X7R105K500MT
Hre
MLCC 50V ±10% 1uF X7R 0805

Lead Time: 9-12Days

-- --
6300
Total: $
CGA1206X7R224K251NT
Hre

Lead Time: 9-12Days

-- --
6900
Total: $
CGA1206X5R226M350NT
Hre
MLCC 35V ±20% 22uF X5R 1206

Lead Time: 9-12Days

-- --
7500
Total: $
CGA0805X5R476M100MT
Hre
MLCC 10V ±20% 47uF X5R 0805

Lead Time: 9-12Days

-- --
8700
Total: $
AV20070005
Txc

Lead Time: 9-12Days

-- --
1500
Total: $
AC0603FR-076M8L
Yageo
6.8-MOhms-±1%-0.1W-1-10W--06031608---AEC-Q200--

Lead Time: 9-12Days

-- --
900
Total: $
  • 1
  • 210
  • 211
  • 212
  • 213
  • 214
  • 6854
Go to