Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
1N5819WS
Dowo

Lead Time: 9-12Days

-- --
1300
Total: $
TSV914AIYDT
St
TSV914A Series 5.5 V 8 MHz Rail to Rail SMT Operational Amplifier - SOIC-14

Lead Time: 9-12Days

-- --
1900
Total: $
P6KE8.2A
Dowo

Lead Time: 9-12Days

-- --
2300
Total: $
B5817WS
Dowo

Lead Time: 9-12Days

-- --
2500
Total: $
1.5KE43CA
Dowo

Lead Time: 9-12Days

-- --
2700
Total: $
SMBJ3V3HE3_B/H
Vishay
ESD/TVS Vishay

Lead Time: 9-12Days

-- --
3300
Total: $
5KP33A
Dowo

Lead Time: 9-12Days

-- --
3700
Total: $
M1820Z
Mysentech
1-Wire,±0.1℃@0℃~50℃,-70℃~+150℃,16bit ADC 0.004℃,10.5ms,5.2μA@3.3V,1Hz,1.8V~5.5V,32bit EEPROM。

Lead Time: 9-12Days

-- --
4300
Total: $
M1601Z
Mysentech
1-Wire,±0.1℃@0℃ to 50℃,-70℃~+150℃,16bit ADC 0.004℃,10.5ms,5.2μA@3.3V,1Hz,1.8V~5.5V,32bit EEPROM。

Lead Time: 9-12Days

-- --
4500
Total: $
F12TH5
Kuu

Lead Time: 9-12Days

-- --
100
Total: $
KNTC1206/10KF3450
Kuu

Lead Time: 9-12Days

-- --
300
Total: $
PESD0402MS05
Kuu
!

Lead Time: 9-12Days

-- --
4900
Total: $
KSD103AX
Kuu
600mV@200mA 40V 350mA SOD-523

Lead Time: 9-12Days

-- --
5300
Total: $
CL21A106KACLRNC
Samsung
MLCC 25V ±10% 10uF X5R 0805

Lead Time: 9-12Days

-- --
6100
Total: $
CL32A476KPJNNNE
Samsung
MLCC 10V ±10% 47uF X5R 1210

Lead Time: 9-12Days

-- --
6700
Total: $
SS510A
Dowo

Lead Time: 9-12Days

-- --
7100
Total: $
KNTC0603/30KJ3950
Kuu

Lead Time: 9-12Days

-- --
7300
Total: $
KNTC0603/10KF3380
Kuu

Lead Time: 9-12Days

-- --
7500
Total: $
CL10C470JB81PNC
Samsung
MLCC 50V ±5% 47pF C0G 0603

Lead Time: 9-12Days

-- --
7700
Total: $
KESD0805/27V
Kuu
!

Lead Time: 9-12Days

-- --
8100
Total: $
  • 1
  • 19
  • 20
  • 21
  • 22
  • 23
  • 6733
Go to