Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MAX5954AETX+
Analog Devices
IC HOT PLUG CTRLR PCI EXP 36TQFN

MPQ: 50

Lead Time: 9-12Days

-- --
400
Total: $
LT1641-2IS8#PBF
Analog Devices
IC HOT SWAP CTRLR GP 8SOIC

MPQ: 100

Lead Time: 9-12Days

-- --
8900
Total: $
20021121-10016C1LF
Amphenol
CONN 127 CONN VERT HDR

MPQ: 600

Lead Time: 9-12Days

-- --
2800
Total: $
LTC4231IUD-2#PBF
Analog Devices
IC HOT SWAP CTRLR GP 12QFN

MPQ: 121

Lead Time: 9-12Days

-- --
2000
Total: $
1-2029171-4
Te Connectivity
CONN HEADER VERT 14POS 4.2MM

MPQ: 1

Lead Time: 9-12Days

-- --
2700
Total: $
LTC4231IMS-2#PBF
Analog Devices
IC HOT SWAP CTRLR GP 12MSOP

MPQ: 37

Lead Time: 9-12Days

-- --
1600
Total: $
880-70-015-20-001101
Preci-Dip
CONN HEADER R/A 15POS 2MM

MPQ: 700

Lead Time: 9-12Days

-- --
8200
Total: $
350-80-109-00-106101
Preci-Dip
CONN HEADER SMD 9POS 2.54MM

MPQ: 750

Lead Time: 9-12Days

-- --
3700
Total: $
LTC4218CDHC-12#PBF
Analog Devices
IC HOT SWAP CTRLR ATCA 16DFN

MPQ: 73

Lead Time: 9-12Days

-- --
6100
Total: $
LTC4252CIMS-2#PBF
Analog Devices
IC HOT SWAP CTRLR -48V 10MSOP

MPQ: 50

Lead Time: 9-12Days

-- --
2300
Total: $
1586044-8
Te Connectivity
CONN HEADER R/A 8POS 4.2MM

MPQ: 1400

Lead Time: 9-12Days

-- --
500
Total: $
LTC4218IGN#PBF
Analog Devices
IC HOT SWAP CTRLR ATCA 16SSOP

MPQ: 100

Lead Time: 9-12Days

-- --
7800
Total: $
351-80-106-00-005101
Preci-Dip
CONN HEADER VERT 6POS 2.54MM

MPQ: 700

Lead Time: 9-12Days

-- --
300
Total: $
LTC4219CDHC-12#PBF
Analog Devices
IC HOT SWAP CTRLR GP 16DFN

MPQ: 73

Lead Time: 9-12Days

-- --
1200
Total: $
LTC4226IUD-1#PBF
Analog Devices
IC HOT SWAP CTRLR GP 16QFN

MPQ: 121

Lead Time: 9-12Days

-- --
1200
Total: $
LTC4226IMS-2#PBF
Analog Devices
IC HOT SWAP CTRLR GP 16MSOP

MPQ: 37

Lead Time: 9-12Days

-- --
2800
Total: $
9-176314-0
Te Connectivity
CONN HEADER SMD 30POS 1.25MM

MPQ: 20

Lead Time: 9-12Days

-- --
9200
Total: $
LTC4217IDHC#PBF
Analog Devices
IC HOT SWAP CTRLR GP 16DFN

MPQ: 73

Lead Time: 9-12Days

-- --
1100
Total: $
802-10-008-10-002101
Preci-Dip
CONN HEADER VERT 8POS 2.54MM

MPQ: 1200

Lead Time: 9-12Days

-- --
800
Total: $
LTC4217IDHC-12#PBF
Analog Devices
IC HOT SWAP CTRLR GP 16DFN

MPQ: 73

Lead Time: 9-12Days

-- --
6800
Total: $
  • 1
  • 203
  • 204
  • 205
  • 206
  • 207
  • 133034
Go to