Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
DDTD122TU-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
6100
Total: $
DDTD122LU-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
8800
Total: $
DDTC144WUA-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
5100
Total: $
DDTC144VUA-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
5300
Total: $
MKP385E45663KKP2T0
Vishay
CAP FILM 0.56UF 10% 630VDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
1100
Total: $
MKP385E45663KKM2T0
Vishay
CAP FILM 0.56UF 10% 630VDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
7000
Total: $
DDTC144GUA-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
500
Total: $
MKP385E45663KKI2B0
Vishay
CAP FILM 0.56UF 10% 630VDC RAD

MPQ: 125

Lead Time: 9-12Days

-- --
5000
Total: $
DDTC143TUA-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
6800
Total: $
MKP385E41810KI02W0
Vishay
CAP FILM 0.18UF 10% 1KVDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
2100
Total: $
DDTC143FCA-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT23-3

MPQ: 3000

Lead Time: 9-12Days

-- --
6100
Total: $
MKP385E3182BKIP2T0
Vishay
CAP FILM 0.018UF 10% 2.5KVDC RAD

MPQ: 140

Lead Time: 9-12Days

-- --
200
Total: $
DDTC142TU-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
5600
Total: $
MKP385E3182BKII2B0
Vishay
CAP FILM 0.018UF 10% 2.5KVDC RAD

MPQ: 400

Lead Time: 9-12Days

-- --
9800
Total: $
MKP385E3182BKIM2T0
Vishay
CAP FILM 0.018UF 10% 2.5KVDC RAD

MPQ: 140

Lead Time: 9-12Days

-- --
8400
Total: $
DDTC142JU-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
2100
Total: $
F340Y238230MII2B0
Vishay
CAP FILM 0.082UF 20% 1KVDC RAD

MPQ: 250

Lead Time: 9-12Days

-- --
6600
Total: $
DDTC125TCA-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT23-3

MPQ: 3000

Lead Time: 9-12Days

-- --
3100
Total: $
F340Y238230MIP2T0
Vishay
CAP FILM 0.082UF 20% 1KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
9100
Total: $
DDTC124TUA-7
Diodes Incorporated
TRANS PREBIAS NPN 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
8800
Total: $
  • 1
  • 2033
  • 2034
  • 2035
  • 2036
  • 2037
  • 6655
Go to