Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MKP385E4101AKKP2T0
Vishay
CAP FILM 0.1UF 10% 1.6KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
800
Total: $
MKP385E48240KI02W0
Vishay
CAP FILM 0.82UF 10% 400VDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
2400
Total: $
DDTB142JU-7-F
Diodes Incorporated
TRANS PREBIAS PNP 50V SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
2400
Total: $
DDTA122LE-7-F
Diodes Incorporated
TRANS PREBIAS PNP 150MW SOT523

MPQ: 3000

Lead Time: 9-12Days

-- --
9600
Total: $
MKP385E41510JIM2T0
Vishay
CAP FILM 0.15UF 5% 1KVDC RAD

MPQ: 150

Lead Time: 9-12Days

-- --
3000
Total: $
MKP385E41510JII2B0
Vishay
CAP FILM 0.15UF 5% 1KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
1400
Total: $
MKP385E3562AKI02W0
Vishay
CAP FILM 0.056UF 10% 2KVDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
400
Total: $
DDTB122TU-7-F
Diodes Incorporated
TRANS PREBIAS PNP 200MW SOT323

MPQ: 3000

Lead Time: 9-12Days

-- --
9500
Total: $
MKP385E41510JIP2T0
Vishay
CAP FILM 0.15UF 5% 1KVDC RAD

MPQ: 150

Lead Time: 9-12Days

-- --
500
Total: $
F340Y235630JIP2T0
Vishay
CAP FILM 0.056UF 5% 1KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
4600
Total: $
DDTC122TE-7-F
Diodes Incorporated
TRANS PREBIAS NPN 150MW SOT523

MPQ: 3000

Lead Time: 9-12Days

-- --
6900
Total: $
F340Y235630JII2B0
Vishay
CAP FILM 0.056UF 5% 1KVDC RAD

MPQ: 250

Lead Time: 9-12Days

-- --
300
Total: $
F340Y235630JIM2T0
Vishay
CAP FILM 0.056UF 5% 1KVDC RAD

MPQ: 200

Lead Time: 9-12Days

-- --
2800
Total: $
DDTC124GE-7-F
Diodes Incorporated
TRANS PREBIAS NPN 50V SOT523

MPQ: 3000

Lead Time: 9-12Days

-- --
7300
Total: $
MKP385E42763JFP2B0
Vishay
CAP FILM 0.27UF 5% 630VDC RAD

MPQ: 225

Lead Time: 9-12Days

-- --
6900
Total: $
MKP385E42285KI02W0
Vishay
CAP FILM 0.22UF 10% 850VDC RAD

MPQ: 300

Lead Time: 9-12Days

-- --
500
Total: $
MKP385E3561AJI02W0
Vishay
CAP FILM 0.056UF 5% 1.6KVDC RAD

MPQ: 350

Lead Time: 9-12Days

-- --
700
Total: $
MKP385E42763JFM2B0
Vishay
CAP FILM 0.27UF 5% 630VDC RAD

MPQ: 225

Lead Time: 9-12Days

-- --
8700
Total: $
DDTC122LE-7-F
Diodes Incorporated
TRANS PREBIAS NPN 50V SOT523

MPQ: 3000

Lead Time: 9-12Days

-- --
5600
Total: $
MKP385E42763JFI2B0
Vishay
CAP FILM 0.27UF 5% 630VDC RAD

MPQ: 350

Lead Time: 9-12Days

-- --
7800
Total: $
  • 1
  • 2031
  • 2032
  • 2033
  • 2034
  • 2035
  • 6655
Go to