Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PBC04SAFN
Sullins Connector Solutions
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
NRPN141PAEN-RC
Sullins Connector Solutions
CONN HEADER VERT 14POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
9400
Total: $
4-103322-0-05
Te Connectivity
CONN HEADER VERT 10POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9200
Total: $
TSW-111-08-T-S
Samtec
CONN HEADER VERT 11POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5900
Total: $
DF1504S
Diodes Incorporated
BRIDGE RECT 1P 400V 1.5A DF-S

MPQ: 50

Lead Time: 9-12Days

-- --
5200
Total: $
MTMS-108-02-T-S-100
Samtec
CONN HDR .050" 8POS

MPQ: 1

Lead Time: 9-12Days

-- --
2400
Total: $
HTMS-103-01-G-S-SM
Samtec
CONN HDR .050" 10POS

MPQ: 1

Lead Time: 9-12Days

-- --
8700
Total: $
HTSW-108-22-T-S-RA
Samtec
CONN HEADER R/A 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9000
Total: $
MIC4609YWM
Microchip
IC GATE DRVR HALF-BRIDGE 28SOIC

MPQ: 27

Lead Time: 9-12Days

-- --
3500
Total: $
TSW-204-10-T-S-RE
Samtec
CONN HDR .200" 4POS

MPQ: 1

Lead Time: 9-12Days

-- --
6400
Total: $
MC33285D
Nxp Semiconductors
IC GATE DRVR HIGH-SIDE 8SOIC

MPQ: 98

Lead Time: 9-12Days

-- --
700
Total: $
HTSW-204-17-TM-S
Samtec
CONN HEADER VERT 4POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
3300
Total: $
MC33883DW
Nxp Semiconductors
IC GATE DRVR HALF-BRIDGE 20SOIC

MPQ: 38

Lead Time: 9-12Days

-- --
9400
Total: $
HTSW-204-17-T-S
Samtec
CONN HEADER VERT 4POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
9300
Total: $
MTSW-108-22-T-S-330-RA
Samtec
CONN HEADER R/A 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4800
Total: $
HTSW-107-11-TM-S-RA
Samtec
CONN HEADER R/A 7POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7900
Total: $
HTSW-108-17-T-S
Samtec
CONN HEADER VERT 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2800
Total: $
PHD33NQ20T,118
Nxp Semiconductors
IC GATE DRVR HDMI 38TSSOP

MPQ: 2500

Lead Time: 9-12Days

-- --
4100
Total: $
PHD45NQ15T,118
Nxp Semiconductors
IC GATE DRVR HDMI 38TSSOP

MPQ: 2500

Lead Time: 9-12Days

-- --
9800
Total: $
UBA2032T/N2,118
Nxp Semiconductors
IC GATE DRVR HALF-BRIDGE 24SO

MPQ: 1000

Lead Time: 9-12Days

-- --
600
Total: $
  • 1
  • 201
  • 202
  • 203
  • 204
  • 205
  • 6654
Go to