
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
350-10-105-00-206101
| Preci-Dip |
CONN HEADER SMD R/A 5POS 2.54MM
| MPQ: 800 Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
0022283196
| Molex |
CONN HEADER VERT 19POS 2.54MM
| MPQ: 250 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
0022283190
| Molex |
CONN HEADER VERT 19POS 2.54MM
| MPQ: 250 Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
2-1969584-0
| Te Connectivity |
CONN HEADER VERT 20POS 2.5MM
| MPQ: 160 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
880-70-013-20-001101
| Preci-Dip |
CONN HEADER R/A 13POS 2MM
| MPQ: 800 Lead Time: 9-12Days | -- -- | 2800 | Total:
$
| |
69192-216HTLF
| Amphenol |
CONN HEADER VERT 16POS 2.54MM
| MPQ: 28 Lead Time: 9-12Days | -- -- | 7200 | Total:
$
| |
94262-314TRLF
| Amphenol |
CONN HEADER SMD 14POS 2MM
| MPQ: 750 Lead Time: 9-12Days | -- -- | 2400 | Total:
$
| |
MAX14850ASE+
| Analog Devices |
DGTL ISOLTR 0.6KV 6CH GP 16-SOIC
| MPQ: 50 Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
1-2029170-2
| Te Connectivity |
CONN HEADER VERT 12POS 4.2MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
0702871248
| Molex |
CONN HEADER VERT 10POS 2.54MM
| MPQ: 2000 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
SI8440BB-D-IS
| Skyworks |
DGTL ISOLTR 2.5KV 4CH GP 16-SOIC
| MPQ: 46 Lead Time: 9-12Days | -- -- | 6400 | Total:
$
| |
10127820-0821CLF
| Amphenol |
CONN HEADER VERT 8POS 4.2MM
| MPQ: 100 Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
0428920081
| Molex |
CONN HEADER R/A 3POS 3.96MM
| MPQ: 600 Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
350-10-102-01-899191
| Preci-Dip |
CONN HEADER SMD 2POS 2.54MM
| MPQ: 650 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
10082201-104A06LF
| Amphenol |
CONN HEADER R/A 6POS 2.54MM
| MPQ: 650 Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
MKP385E44763JKI2T0
| Vishay |
CAP FILM 0.47UF 5% 630VDC RAD
| MPQ: 125 Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
MKP385E44763JKM2T0
| Vishay |
CAP FILM 0.47UF 5% 630VDC RAD
| MPQ: 100 Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
MKP385E48240JKI2B0
| Vishay |
CAP FILM 0.82UF 5% 400VDC RAD
| MPQ: 125 Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
MKP385E44763JKP2B0
| Vishay |
CAP FILM 0.47UF 5% 630VDC RAD
| MPQ: 100 Lead Time: 9-12Days | -- -- | 2900 | Total:
$
| |
MKP385E48240JKP2T0
| Vishay |
CAP FILM 0.82UF 5% 400VDC RAD
| MPQ: 100 Lead Time: 9-12Days | -- -- | 500 | Total:
$
|