Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
VZH331M1ATR-0607
Lelon Electronics Corp.
6.3mm*7.7mm 330μF ±20% 10V

Lead Time: 9-12Days

-- --
6100
Total: $
VEJ470M1VTR-0605
Lelon Electronics Corp.
,Can-SMD 47μF ±20% 35V

Lead Time: 9-12Days

-- --
3500
Total: $
VEJ101M1CTR-0605
Lelon Electronics Corp.
6.3mm*5.3mm 100μF ±20% 16VDC

Lead Time: 9-12Days

-- --
3700
Total: $
VES220M1ETR-0505
Lelon Electronics Corp.
SMD,D5xL5.3mm 22µF ±20% 25V 1000Hrs@105℃

Lead Time: 9-12Days

-- --
3900
Total: $
VEJ101M1HTR-0810
Lelon Electronics Corp.
-SMD

Lead Time: 9-12Days

-- --
4700
Total: $
VEJ471M1VTR-1313
Lelon Electronics Corp.
5151 470μF ±20% 35VDC

Lead Time: 9-12Days

-- --
4900
Total: $
VEJ102M1ETR-1313
Lelon Electronics Corp.
12.5mm*13.5mm 1000μF ±20% 25V

Lead Time: 9-12Days

-- --
5300
Total: $
H2405S-2WR3
Ylptec

Lead Time: 9-12Days

-- --
7100
Total: $
H0303S-1WR2
Ylptec

Lead Time: 9-12Days

-- --
7700
Total: $
GX2431P
Gxcas

Lead Time: 9-12Days

-- --
1900
Total: $
GX28E17Q
Gxcas

Lead Time: 9-12Days

-- --
2100
Total: $
H1212S-2WR2
Ylptec

Lead Time: 9-12Days

-- --
7100
Total: $
H0512S-1WR2
Ylptec

Lead Time: 9-12Days

-- --
7300
Total: $
HAW3-220S09T2
Ylptec

Lead Time: 9-12Days

-- --
3500
Total: $
QA123C-2005R3
Ylptec

Lead Time: 9-12Days

-- --
7500
Total: $
QA243-1509R3
Ylptec

Lead Time: 9-12Days

-- --
8900
Total: $
QA243HCD2-1803R3
Ylptec

Lead Time: 9-12Days

-- --
9900
Total: $
BL9161G-33BAURN
Shanghai Belling

Lead Time: 9-12Days

-- --
2300
Total: $
BLL2681CD8TR
Shanghai Belling

Lead Time: 9-12Days

-- --
2700
Total: $
B0505M-2WR3
Ylptec

Lead Time: 9-12Days

-- --
3700
Total: $
  • 1
  • 199
  • 200
  • 201
  • 202
  • 203
  • 6854
Go to