Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
HTSW-104-07-SS-S
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7200
Total: $
HTSW-103-23-F-D
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6900
Total: $
HTSW-103-21-T-D
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8900
Total: $
PBRN123ET,215
Nexperia
TRANS PREBIAS NPN 40V TO236AB

MPQ: 3000

Lead Time: 9-12Days

-- --
8900
Total: $
PBRP113ZT,215
Nexperia
TRANS PREBIAS PNP 40V TO236AB

MPQ: 3000

Lead Time: 9-12Days

-- --
4000
Total: $
HTSW-102-14-F-D-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3200
Total: $
TSW-105-30-F-S
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1900
Total: $
TSW-105-22-T-S-LA
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2700
Total: $
TSW-104-08-F-S-LA
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7800
Total: $
TSW-104-06-F-S-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
7900
Total: $
TSW-104-05-F-S-LL
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9000
Total: $
BCR555E6327HTSA1
Infineon
TRANS PREBIAS PNP 50V SOT23

MPQ: 3000

Lead Time: 9-12Days

-- --
3700
Total: $
BCR562E6327HTSA1
Infineon
TRANS PREBIAS PNP 50V SOT23

MPQ: 3000

Lead Time: 9-12Days

-- --
2700
Total: $
TSW-103-07-T-S-001
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5800
Total: $
TSW-103-07-H-S
Samtec
CONN HEADER VERT 3POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8900
Total: $
DRDPB16W-7
Diodes Incorporated
TRANS PREBIAS PNP 50V SOT363

MPQ: 3000

Lead Time: 9-12Days

-- --
400
Total: $
TSW-102-11-T-T-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
6400
Total: $
TSW-102-09-L-Q-RA
Samtec
CONN HEADER R/A 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
TSW-102-07-F-S-001
Samtec
CONN HEADER VERT 2POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
TMM-103-05-T-D-SM
Samtec
2MM TERMINAL STRIP

MPQ: 98

Lead Time: 9-12Days

-- --
400
Total: $
  • 1
  • 2005
  • 2006
  • 2007
  • 2008
  • 2009
  • 6655
Go to