
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
SM5100BF
| Lrc |
850mV 100V 10mA
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
SZYY0603G1
| Yongyu | Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| ||
BZX84C6V2_R1_00001
| Panjit |
410mW,ZENER,SOT-23,6.2V
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
MMBTA05_R1_00001
| Panjit |
BJT 225mW 60V 500mA NPN SOT-23
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
SS210HE
| Dowo |
100V 2A SOD-123HE
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
S1M
| Dowo |
1kV 1A SMA
| Lead Time: 9-12Days | -- -- | 4700 | Total:
$
| |
BZT52C51
| Dowo | Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| ||
SMAJ12A
| Dowo | Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| ||
DF01S
| On |
1.1V@1.5A 100V 5uA@100V 1.5A SDIP-4
| Lead Time: 9-12Days | -- -- | 6500 | Total:
$
| |
DW-1206-020-30
| Dowo | Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| ||
SP5100L
| Dowo |
600mV 100V 5A
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
SMCJ24A
| Dowo |
ESD/TVS VRWM=24V VBRmin=26.7V VC=38.9V@IPP=38.56A SMC
| Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| |
SMBJ28A
| Dowo |
SMB SMT 28V 45.4V
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
BZT52C39
| Dowo | Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| ||
MMBZ33VAL
| Dowo | Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| ||
5.0SMDJ140CA
| Dowo | Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| ||
BZT52C5V6
| Dowo | Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| ||
BAT60B
| Dowo | Lead Time: 9-12Days | -- -- | 700 | Total:
$
| ||
LMV721-DW
| Dowo | Lead Time: 9-12Days | -- -- | 900 | Total:
$
| ||
M1601B
| Mysentech |
1-wire,0.5℃@0℃~50℃,-70℃~150℃,16bit ADC 0.004℃,10.5ms,5.2μA@3.3V,1Hz,1.8V~5.5V,32bit EEPROM。
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
|