Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MAX66240ESA+
Analog Devices
IC AUTHENTICATION CHIP 8SOIC

MPQ: 1

Lead Time: 9-12Days

-- --
5600
Total: $
GCJ31MR71H184KA01L
Murata
CAP CER

MPQ: 3000

Lead Time: 9-12Days

-- --
300
Total: $
MAX66240ETB+
Analog Devices
IC AUTHENTICATION CHIP 10TDFN

MPQ: 1

Lead Time: 9-12Days

-- --
4400
Total: $
GCJ31MR71H184MA01L
Murata
CAP CER

MPQ: 3000

Lead Time: 9-12Days

-- --
2600
Total: $
MAX66240ETB+T
Analog Devices
IC AUTHENTICATION CHIP 10TDFN

MPQ: 2500

Lead Time: 9-12Days

-- --
6100
Total: $
GCJ31MR71H224MA01L
Murata
CAP CER

MPQ: 3000

Lead Time: 9-12Days

-- --
5300
Total: $
MAX66242ESA+
Analog Devices
IC AUTHENTICATION CHIP 8SOIC

MPQ: 1

Lead Time: 9-12Days

-- --
5100
Total: $
GCJ31MR71H124KA01L
Murata
CAP CER

MPQ: 3000

Lead Time: 9-12Days

-- --
6400
Total: $
GCJ31MR71H124MA01L
Murata
CAP CER

MPQ: 3000

Lead Time: 9-12Days

-- --
7300
Total: $
GCJ31MR71H224KA01L
Murata
CAP CER

MPQ: 3000

Lead Time: 9-12Days

-- --
9300
Total: $
MAX66242ESA+T
Analog Devices
IC AUTHENTICATION CHIP 8SOIC

MPQ: 2500

Lead Time: 9-12Days

-- --
3500
Total: $
GCJ31MR71H154KA01L
Murata
CAP CER

MPQ: 3000

Lead Time: 9-12Days

-- --
6700
Total: $
MAX66242ETB+
Analog Devices
IC AUTHENTICATION CHIP 10TDFN

MPQ: 1

Lead Time: 9-12Days

-- --
3600
Total: $
MAX66242ETB+T
Analog Devices
IC AUTHENTICATION CHIP 10TDFN

MPQ: 2500

Lead Time: 9-12Days

-- --
8100
Total: $
GRT21B5C1H103JA02L
Murata
CAP CER 10000PF 50V C0G/NP0 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
5400
Total: $
MAX66240ETB-A+
Analog Devices
IC AUTHENTICATION CHIP 10TDFN

MPQ: 1

Lead Time: 9-12Days

-- --
6700
Total: $
MAX66240ETB-A+T
Analog Devices
IC AUTHENTICATION CHIP 10TDFN

MPQ: 2500

Lead Time: 9-12Days

-- --
5300
Total: $
MAX66240ISA+
Analog Devices
IC AUTHENTICATION CHIP 8SOIC

MPQ: 1

Lead Time: 9-12Days

-- --
9100
Total: $
MAX66242ETB-A+
Analog Devices
IC AUTHENTICATION CHIP 10TDFN

MPQ: 1

Lead Time: 9-12Days

-- --
6600
Total: $
MAX66242ETB-A+T
Analog Devices
IC AUTHENTICATION CHIP 10TDFN

MPQ: 2500

Lead Time: 9-12Days

-- --
6800
Total: $
  • 1
  • 1987
  • 1988
  • 1989
  • 1990
  • 1991
  • 6655
Go to