Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CSA0402C0G120J500GT
Hre
MLCC 50V ±5% 12pF C0G 0402

Lead Time: 9-12Days

-- --
2900
Total: $
INA181A3IDBVR(LX)
Lx

Lead Time: 9-12Days

-- --
5900
Total: $
INA180A2IDBVR(LX)
Lx
INA180A2IDBVRLX SOT-23-5

Lead Time: 9-12Days

-- --
6100
Total: $
LTM4628IY#PBF
Analog Devices
-PoL---2--0.6-~-5.5V-0.6-~-5.5V-8A-8A-4.5V-26.5V-

Lead Time: 9-12Days

-- --
1900
Total: $
SMBJ64A
Dowo

Lead Time: 9-12Days

-- --
5300
Total: $
SN74LS245N(LX)
Lx
// SN74LS245NLX DIP-20

Lead Time: 9-12Days

-- --
300
Total: $
SN74LS148DR(LX)
Lx
// SN74LS148DRLX SOP-16

Lead Time: 9-12Days

-- --
900
Total: $
SN74HC541D(LX)
Lx
// SN74HC541DLX SOP-20

Lead Time: 9-12Days

-- --
1100
Total: $
SN74HC595D(LX)
Lx
SN74HC595DLX SOP-16

Lead Time: 9-12Days

-- --
4700
Total: $
SN74HC4053D(LX)
Lx
/ SN74HC4053DLX SOP-16

Lead Time: 9-12Days

-- --
7500
Total: $
SN74LS86AN(LX)
Lx
SN74LS86ANLX DIP-14

Lead Time: 9-12Days

-- --
8900
Total: $
SN74LS04N(LX)
Lx
SN74LS04NLX DIP-14

Lead Time: 9-12Days

-- --
9100
Total: $
SN74HC273PW(LX)
Lx
SN74HC273PWLX TSSOP-20

Lead Time: 9-12Days

-- --
3300
Total: $
MB10F
Jscj
1V@400mA 1kV 5uA@1kV 800mA MBF

Lead Time: 9-12Days

-- --
6100
Total: $
MAX232ESE(LX)
Lx
RS232 MAX232ESELX SOP-16

Lead Time: 9-12Days

-- --
4900
Total: $
MX115
Mixic

Lead Time: 9-12Days

-- --
2100
Total: $
SN74LVC1GU04DB(LX)
Lx
SN74LVC1GU04DBLX SOT-23-5

Lead Time: 9-12Days

-- --
5500
Total: $
SN74LVC1T45DB(LX)
Lx
/ SN74LVC1T45DBLX SOT-23-6

Lead Time: 9-12Days

-- --
6500
Total: $
TP4054(LX)
Lx
TP4054LX SOT-23-5

Lead Time: 9-12Days

-- --
5700
Total: $
28F0121-1SR-10
Laird

Lead Time: 9-12Days

-- --
1900
Total: $
  • 1
  • 192
  • 193
  • 194
  • 195
  • 196
  • 6748
Go to