Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
0805Y0630472KET
Knowles
CAP CER 4700PF 63V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
2700
Total: $
DSF050J185
Cornell Dubilier
CAP FILM 1.8UF 5% 50VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
3800
Total: $
0805Y0630472KDT
Knowles
CAP CER 4700PF 63V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
2600
Total: $
DSF050J184
Cornell Dubilier
CAP FILM 0.18UF 5% 50VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
9000
Total: $
0805Y0630392KET
Knowles
CAP CER 3900PF 63V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
3300
Total: $
0805Y0630392KDT
Knowles
CAP CER 3900PF 63V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
2600
Total: $
ISL58328CIZ-T7
Renesas
SENSOR - OPTICAL VOLTAGE

MPQ: 2500

Lead Time: 9-12Days

-- --
5000
Total: $
ISL58334CIZ-T7
Renesas
SENSOR - OPTICAL VOLTAGE

MPQ: 2500

Lead Time: 9-12Days

-- --
6900
Total: $
DSF050J183
Cornell Dubilier
CAP FILM 0.018UF 5% 50VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
3100
Total: $
0805Y0630332KET
Knowles
CAP CER 3300PF 63V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
8600
Total: $
ISL58327CIZ-T7
Renesas
SENSOR OPT DIFFERENTIAL VOLTAGE

MPQ: 2500

Lead Time: 9-12Days

-- --
900
Total: $
DSF050J155
Cornell Dubilier
CAP FILM 1.5UF 5% 50VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
6200
Total: $
MAX30100EFD+
Analog Devices
SENSOR - OXIMETER/HEART RATE -

MPQ: 100

Lead Time: 9-12Days

-- --
6600
Total: $
0805Y0630332KDT
Knowles
CAP CER 3300PF 63V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
2900
Total: $
SP270252560XTMA1
Infineon
SENSOR TIRE PRESSURE DIGITAL

MPQ: 1000

Lead Time: 9-12Days

-- --
2000
Total: $
DSF050J154
Cornell Dubilier
CAP FILM 0.15UF 5% 50VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
4800
Total: $
0805Y0630272KET
Knowles
CAP CER 2700PF 63V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
600
Total: $
SP370231560XTMA1
Infineon
SENSOR TIRE PRESSURE DIGITAL

MPQ: 1000

Lead Time: 9-12Days

-- --
5300
Total: $
DSF050J153
Cornell Dubilier
CAP FILM 0.015UF 5% 50VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
1400
Total: $
0805Y0630272KDT
Knowles
CAP CER 2700PF 63V X7R 0805

MPQ: 3000

Lead Time: 9-12Days

-- --
800
Total: $
  • 1
  • 1887
  • 1888
  • 1889
  • 1890
  • 1891
  • 6854
Go to