Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
1206Y2502P70DCT
Knowles
CAP CER 2.7PF 250V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8100
Total: $
KTY11-7
Infineon
SENSOR PTC 2.03KOHM 3% TO92MINI

MPQ: 1000

Lead Time: 9-12Days

-- --
5300
Total: $
1206Y2502P20DCT
Knowles
CAP CER 2.2PF 250V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
3500
Total: $
KTY13-6
Infineon
SENSOR PTC 2KOHM 3% SOT23-3

MPQ: 3000

Lead Time: 9-12Days

-- --
4000
Total: $
1206Y2501P80DCT
Knowles
CAP CER 1.8PF 250V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
7800
Total: $
KTY13-7
Infineon
SENSOR PTC 2.03KOHM 3% SOT23-3

MPQ: 3000

Lead Time: 9-12Days

-- --
8800
Total: $
1206Y2501P50DCT
Knowles
CAP CER 1.5PF 250V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
7100
Total: $
1206Y2501P20DCT
Knowles
CAP CER 1.2PF 250V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
7700
Total: $
KTY23-6
Infineon
SENSOR PTC 1KOHM 3% SOT23-3

MPQ: 3000

Lead Time: 9-12Days

-- --
2100
Total: $
KTY83/121,153
Nxp Semiconductors
SENSOR PTC 990OHM DO34

MPQ: 1000

Lead Time: 9-12Days

-- --
3800
Total: $
KTY83/121,113
Nxp Semiconductors
SENSOR PTC 990OHM DO34

MPQ: 10000

Lead Time: 9-12Days

-- --
200
Total: $
1206Y2501P00DCT
Knowles
CAP CER 1PF 250V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
8300
Total: $
KTY84/130,153
Nxp Semiconductors
SENSOR PTC 603OHM DO34

MPQ: 1000

Lead Time: 9-12Days

-- --
8000
Total: $
1206Y2008P20DCT
Knowles
CAP CER 8.2PF 200V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
6000
Total: $
1206Y2006P80DCT
Knowles
CAP CER 6.8PF 200V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4700
Total: $
1206Y2005P60DCT
Knowles
CAP CER 5.6PF 200V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
4500
Total: $
1206Y2004P70DCT
Knowles
CAP CER 4.7PF 200V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
2100
Total: $
1206Y2003P90DCT
Knowles
CAP CER 3.9PF 200V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
800
Total: $
LT3750EMS#TRPBF
Analog Devices
IC FLYBACK FORW CONVERTER 10MSOP

MPQ: 2500

Lead Time: 9-12Days

-- --
7200
Total: $
1206Y2003P30DCT
Knowles
CAP CER 3.3PF 200V C0G/NP0 1206

MPQ: 2500

Lead Time: 9-12Days

-- --
6300
Total: $
  • 1
  • 1884
  • 1885
  • 1886
  • 1887
  • 1888
  • 6655
Go to